Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

CTH M - STH 81, Jordan Creek Bridge, B-23-0179
New Construction, Infrastructure
Bidding
WI

STH 88 - STH 95, Br. Waumandee Cr. Br.,
New Construction, Infrastructure
Bidding
$20,000 est. value
WI

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Town of Herman, Buchanan Road, Butler Creek Bridge
Results
WI

Cassville - Patch Grove, Structures
Results
Cassville, Patch Grove, WI 53806

Wrightstown - Denmark, STH 32 - CTH G; Wrightstown - Denmark, CTH G - IH 43
New Construction, Infrastructure
Bidding
WI

Snowmobile Bridge Replacement Brewery Ditch - Dane 17 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

Pine Line Trail Bridges
Results
WI

Mosinee, 4th Street and Main Street, Pine Street - Wisconsin River Bridge
New Construction, Infrastructure
Bidding
WI

Furbush Creek Trail Bridge
Results
Eagle River, WI

STH 37 - CTH JJ, Tiffany Creek Bridge, B-06-0195
New Construction, Infrastructure
Bidding
WI

CTH X - STH 27, Timber Coulee Creek Bridge
Results
Less than $20,000 est. value
WI

T. Union, Yellow Lake Road, Yellow Lake Bridge, B-07-0060
New Construction, Infrastructure
Bidding
WI

Last Updated 02/08/2022 04:06 PM
Project Title

Bridge Replacement

Physical Address View project details and contacts
City, State (County) Gordon, WI 54838   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of the removal of an existing bridge carrying a private drive over the Eau Claire River and constructing a replacement bridge in the same location. The private drive approach roadway will be replaced at each end of the bridge for a distance before tying into the existing roadway. The new bridge work will include a cast-in-place concrete bridge deck on prestressed concrete girders, cast-in-place concrete abutments on driven steel piling, riprap embankments, and tubular steel railings. The approach work will include minor earthwork grading, asphalt pavement on base aggregate, guardrails, and site restoration

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents