Similar Projects
Y1da--Project Number: 671-22-108 Removal of Carpet Polytrauma Inpatient Ward (Va-21-00049763)
Term Contract
Design
San Antonio, TX

Carpet Installation - District HQ
Alteration
Bidding
$95,000 est. value
Houston, TX 77007

Floor Covering Supply and Installation
Alteration
Bidding
Houston, TX

Carpet Wood and Other Flooring Services Maintenance and Repairs
Post-Bid
Houston, TX

Housing Carpet and Vinyl Installation
Post-Bid
Houston, TX

Z2jz--New - CTX Floor Refinishing Services
Results
Temple, TX 76504

Refurbishment of the Psych Unit at Ben Taub Hospital
Renovation
Results
Houston, TX 77030

Mobile Lab Flooring Repair Services
Post-Bid
Houston, TX

Floor Finish Seal
Post-Bid
Houston, TX

District Wide Ceramic Tile
Post-Bid
Aldine, TX

Floor Material and Installation Services
Post-Bid
Pasadena, TX

Houston HQ Flooring Replacement
Post-Bid
Houston, TX 77282

Classroom Flooring Upgrade of 9 Campuses
Alteration
Post-Bid
Houston, TX

Painting, Drywall, and Flooring
Term Contract
Post-Bid
Houston, TX

IAH - TB and T C Skyway Station Carpet Replacement
Alteration
Post-Bid
$1,050,000 est. value
Houston, TX 77032

Reported 04/29/2022 12:00 AM
Project Title

CMAR CRWC Flooring Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX 77004   (Harris County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace terrazzo and sports flooring in the Campus Recreation and Wellness Center at the University of Houston. The project includes the replacement of all wood floors (approximately 50,000 Square Feet) and terrazzo floors (approximately 50,000 Square Feet) along with minor interior repairs. Said work must take place while the facility is kept open for continuous operation. The Total Project Cost (“TPC”) for this Project is $7,500,000.00. The TPC includes a Construction Cost Limitation (“CCL”) of $6,800.000. HUB Goal 32.9%.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents