Similar Projects
Wastewater Treatment Plant - Dewatering Facility Replacement- Screw Press Procurement
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Houston, TX 77084

HCID No. 14 Dunham Pointe, Section 9 Utilities ,Sanitary Sewer, and Storm Sewer
Infrastructure
Bidding
$1,000,000 CJ est. value
Houston, TX 77020

Construction of Wastewater Treatment Plant Sludge Pumps Replacement
Renovation
Sub-Bidding
$60,000 CJ est. value
Houston, TX 77067

Mechanical, Electrical and Plumbing MEP (JOC)
Alteration
Post-Bid
Houston, TX

Mechanical Electrical and Plumbing Service
Term Contract
Post-Bid
Houston, TX

District Wide Plumbing Parts and Supplies
Term Contract
Results
Humble, TX

District Wide Plumbing Services
Alteration
Results
Aldine, TX

2022 FRP MEP Project
Alteration
Post-Bid
$3,000,000 est. value
Spring, TX

N19 Welding and Construction Renovations
Renovation
Results
$1,883,434 est. value
Houston, TX 77049

Mechanical, Electrical, and Plumbing Service
Alteration
Post-Bid
Houston, TX

Outsourced Plumbing and Repair Service
Term Contract
Results
Deer Park, TX

Plumbing Supplies and Materials
Term Contract
Post-Bid
Houston, TX

2022 Multi - Campus MEP Renovations
Alteration
Results
$13,000,000 est. value
Humble, TX 77396

Maintenance Supplies, Equipment and Services
Term Contract
Post-Bid
Waller, TX

Centrifuges 69th Street Purchase and Installation
Renovation
Results
$4,388,000 CJ est. value
Houston, TX 77011

Last Updated 03/30/2023 11:36 AM
Project Title

Instrument Air System Repair and Replacement Services

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This BVB is being advertised to secure the services on nineteen (19) instrument air systems to move wastewater around the City for treatment and return ensuring compliance with regulatory requirements. MWBE Goal: 1% Pre-bid Questions Deadline: Tuesday, February 28, 2023 (4:00 p.m.) This contract covers the general requirements for the disconnecting, transporting, inspecting, repairing and/or replacing and testing of various instrument air system types located at Wastewater Operations facilities. At a minimum, Contractor shall replace all bearings and seals and the lube reservoir of the repaired instrument air systems/diesel engine shall be flushed clean and filled with the OEM-specified lubricants after reassembly. The intent of this contract is for the Contractor to disconnect, inspect, remove, and/or install, transport, repair and/or replace instrument air systems at the Wastewater Operations' or Contractor's facilities. This specification defines minimum acceptable requirements for the repair of the units and documentation of those repairs as specified in Exhibit B7 (Invoice Checklist). This includes, but is not limited to, valves, pumps, switches, cylinders, filters, pistons, seals, bearings, motors, integral diesel engines, air dryers, gearboxes, couplings, packing or discharge check, and electrical/mechanical work. Contractor shall furnish all supervision, labor, parts, tools, materials, equipment, supplies, transportation, engineering, and facilities necessary to provide precise repair and replacement services for air instrument air systems at various facilities of Wastewater Operations (WWO). The City shall monitor the repair of their instrument air systems on a daily basis. The meaning of some specific terms as used in this contract is given in Exhibit A, (Definitions). The instrument air systems covered by this contract are grouped to accordingly to the air system's type and size of the units provided in Exhibit A (Definitions). After parts have been repaired, the Contractor shall: a) Balance all individual parts and components, then reassemble, test, seal and paint, as required; b) All assembled rotating parts shall be dynamically balanced; and c) All damaged and replaced parts that are deemed non-repairable shall be delivered to a designated location specified by the department representative. After uncoupling the unit, Contractor shall install blinds to ensure that all openings to pipes, inlet and discharge dampeners/silencers, and filters are blocked to prevent entry by rodents and birds. Contractor shall provide the Director or his designee a list of the names and locations of all shops and subcontractors used for the specified repair work prior to the commencement of any work. Contractor shall obtain written approval for each shop and subcontractor before start of the contract. If Contractor plans to use any subcontractor not on the list, 16

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents