Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

CTH G - STH 23 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Plain, WI 53577

Wisconsin Dells - Baraboo Re - Ops for 6145-01-72
Infrastructure
Design
$250,000 to $500,000 est. value
Baraboo, WI

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

RFQ- General Contractor Cliffwood Campground Toilet Shower Building Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,040,000 CJ est. value
Baraboo, WI 53913

RFQ- General Contractor Cliffwood Campground Toilet Shower Building Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,040,000 CJ est. value
Baraboo, WI 53913

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Asphaltic Paving
Infrastructure
Post-Bid
Baraboo, WI

City of Reedsburg, K Street, Alexander Avenue to Albert Avenue
Infrastructure
Results
Reedsburg, WI

Reedsburg - Baraboo, CTH PF to V. West Baraboo W. Limit
Infrastructure
Results
Baraboo, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Baraboo VA Outpatient Clinic
New Construction, Infrastructure - 11,300 SF
Pending Verification
$7,000,000 CJ est. value
Baraboo, WI 53913

Mineral Point - Spring Green Const / Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Loganville, WI 53943

Last Updated 06/08/2023 02:34 AM
Project Title

Spirit Lake 2023 Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate - 05/15/23
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes approximately 2,700 LF PVC sanitary sewer, 2,000 LF PVC forcemain, 8,600 LF DI water main, 2,200 LF RCP storm sewer, submersible pump lift station, 2,200 LF urban roadway including subgrade excavation, base aggregate, concrete curb and gutter. Work also includes approximately 1,600 LF asphalt trail and turn lane and taper construction to provide access to CTH W. Work includes traffic control, erosion control, utility appurtenances and restoration. City will procure sanitary sewer, water main, and storm sewer pipe materials for the Contractor to install. Site Directions: Southwest Quadrant of the Intersection of USH 12 (expressway) and County Rd W in the City of Baraboo

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents