Similar Projects
BMW Parking Lot Expansion
Alteration
Design
Orland Park, IL 60467

North Western Avenue / Mixed-Use
New Construction, Infrastructure
Design
$3,000,000 est. value
Chicago, IL 60618

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Bidding
$300,000 est. value
Lansing, Tinley Park, IL 60438

Roadway Pavement Rehabilitation Project
Infrastructure
Bidding
$80,000 est. value
Schaumburg, IL

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

Site Paving
Post-Bid
Elgin, IL 60120

Grand Avenue Improvements
Renovation
Results
Chicago, IL 60600

2021 Street Improvement Program
Results
Less than $464,820 est. value
Morton Grove, IL

2022 Street Program
Infrastructure
Bidding
$990,000 est. value
Chicago Ridge, IL

HMA Resurfurfacing
Post-Bid
IL

Hart Road and Main Street Water Main Replacement
Results
Less than $563,165 est. value
Barrington, IL

2022 MFT/ RBI Street Rehabilitation
Infrastructure
Bidding
$1,055,771 est. value
Countryside, IL

2021 Roadway Maintenance Program
Post-Bid
Streamwood, IL

2021 Street Program - Contract 2
Results
Schaumburg, IL

Justice 83rd Street Improvements
Infrastructure
Bidding
$650,000 est. value
Justice, IL 60458

Reported 06/23/2022 12:00 AM
Project Title

2022 Green Infrastructure Alley Improvements

Physical Address View project details and contacts
City, State (County) Maywood, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $301,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of green alley improvements within the Village of Maywood. The work to be performed will include the removal and replacement of curb and gutter, sidewalks, and garage aprons; excavation of the existing pavement; installation of an aggregate base course; installation of concrete alley pavement; installation of permeable brick pavers and infiltration within the alley pavements; landscaping restoration of disturbed sections of the parkways, and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents