Similar Projects
Murphy USA #7122 / Canton
New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Canton, OH 44702

Arlington Road Widening & Intersection Improvements - City of Green
Infrastructure
Conception
$12,229,359 CJ est. value
Uniontown, OH 44685

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Fairhope Properties
New Construction, Alteration - 4,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Louisville, OH 44641

Two Lane Resurfacing - SR 44/SR 153
Infrastructure
Bidding
$882,300 CJ est. value
Louisville, OH 44641

Two Lane Resurfacing - SR 44/SR 153
Infrastructure
Bidding
$882,300 CJ est. value
Louisville, OH 44641

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Chip and Seal
Post-Bid
OH

2021 Curbing Replacement
Results
$200,000 est. value
Massillon, OH

Resurfacing Project 2021
Results
$248,701 est. value
Massillon, OH

ModWash / Alliance
New Construction, Infrastructure - 4,600 SF
Pending Verification
$1,000,000 CJ est. value
Alliance, OH 44601

Waikem Car Wash
New Construction, Infrastructure - 4,554 SF
Pending Verification
$1,000,000 CJ est. value
Canton, OH 44720

Gregory Industries Office Building
New Construction, Infrastructure - 19,192 SF
Design
$4,000,000 CJ est. value
Canton, OH 44710

Blacktop Bids
Post-Bid
OH

2021 Asphalt Paving Program Resurfacing Various Township Roads
Results
Canton, OH

Last Updated 09/26/2022 03:34 AM
Project Title

Boettler Road Sidewalk - City of Green

Physical Address View project details and contacts
City, State (County) Uniontown, OH 44685   (Stark County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct at-grade sidewalk from Golden Wood Way to Arlington Road. Cost includes driveway replacement. As of September 26, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents