Similar Projects
National Parks Connector Trail
Infrastructure
Bidding
$600,000 est. value
Portage, IN

Hanna Street Trail - Rudisill to Pettit Avenue
Infrastructure
Bidding
$500,000 est. value
Fort Wayne, IN 46806

Recover Forward Sidewalk
Post-Bid
Bloomington, IN 47402

South Parking Lot and Entrance Lane Sealcoating
Post-Bid
Indianapolis, IN 46200

Bike and Pedestrian Facilities
Results
IN

Downtown Streetscape Revitalization
Results
Bremen, IN 46506

Mixed Use Development
New Construction, Infrastructure - 235,000 SF
Pending Verification
$40,000,000 est. value
Columbus, IN

TMMI Lot #4 Parking Lot Maintenance
Post-Bid
Princeton, IN

Scottsburg Readiness Center Organizational and Non-Organizational Parking Expansion
Results
Scottsburg, IN 47170

2020-2 City of Greensburg Community Crossing Matching Grant
Post-Bid
Greensburg, IN

Ace Cab Parking
New Construction, Demolition
Results
Elkhart, IN 46516

Hamilton Southeastern HS South Parking Lot Reconstruction
Post-Bid
Fishers, IN 46037

Knauf Trail
Results
Shelbyville, IN 46176

Miscellaneous Repair to Curb, Curb and Gutter, Handicap Ramps and other Concrete Flatwork
Post-Bid
Terre Haute, IN 47803

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Reported 04/23/2022 12:00 AM
Project Title

2022 Annual Sidewalk Program - Packages 1 and 2

Physical Address View project details and contacts
City, State (County) Valparaiso, IN   (Porter County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the sidewalk replacement and construction within the City of Valparaiso. Other construction activities include: ADA ramp removal and replacement, concrete aprons, and minor concrete curb work. Contractor will also be responsible for the maintenance of traffic. These will be 2 separate bid packages.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents