Similar Projects
RFQ Engineering - 268th Street Bridge #3470005 Replacement
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Grand River Township, MO 64701

RFQ Engineering - 268th Street Bridge #3470005 Replacement
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Grand River Township, MO 64701

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

2021 Curb Replacement
Infrastructure
Post-Bid
Pleasant Hill, MO

163rd Street Improvements
Results
Pleasant Hill, MO 64080

Resurface on Route A and Route B
Infrastructure
Results
$15,000,000 to $20,000,000 est. value

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

RFQ Engineering - Main Street Bridge #2050002 Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Harrisonville, MO 64701

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

The Depot / Raymore
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Raymore, MO 64083

Resurface
Infrastructure
Bidding
$20,000,000 CJ est. value
Pleasant Hill, MO 64080

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Intersection Improvements and Resurfacing
Infrastructure
Results
MO

Last Updated 11/16/2022 01:01 AM
Project Title

Grading and Pavement

Physical Address View project details and contacts
City, State (County) Peculiar, MO 64078   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,169,236 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J4S3433 Route C CASS County. Grading and pavement at Schug Ave. and S. Peculiar Dr. near Peculiar, MO, the total length of improvement being 0.569 miles. All questions concerning the bid document preparation shall be directed to the Central Office - Design Division at (573) 751-2876. Range: 1M to 2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - C04 - Grading and Pavement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents