Similar Projects
University Place Flooring
Bidding
$400,000 to $450,000 est. value
Conway, SC

Tile and Carpet Replacement
Bidding
Cowpens, SC 29330

TOC - Flooring Construction Services
Term Contract
Post-Bid
Charleston, SC 29401

Piedmont - Newberry Epoxy Floor Upgrade
Post-Bid
$90,000 to $124,200 est. value
Newberry, SC 29108

P--Removal of Outdated Mobile Filing Systems and Repair of Floor on Multiple Floors.
Results
Columbia, SC 29209

Quartz Tile Installation in Hallways at Woodruff High School
Results
Less than $65,900 est. value
Woodruff, SC 29388

Kershaw County Lab Upfits
Construction
$150,000 to $180,000 est. value
Camden, SC

Provide and Install Flooring
Bidding
Darlington, SC

SCDMH Carpet Install
Post-Bid
Columbia, SC

Tile for the Charleston Tennis Center
Term Contract
Results
Charleston, SC 29401

Moss Hall Records Office Upfit
Build-Out
Bidding
$100,000 to $115,000 est. value
Orangeburg, SC 29115

Epoxy Flooring Contract
Post-Bid
Columbia, SC

Carpet and Vinyl Floor Replacement - 401 Pilchard Court
Results
Florence, SC 29501

2021 Scrubbing and Coating of Gymnasium Floors
Bidding
Aiken, Graniteville, Jackson, Monetta, New Ellenton, North Augusta, Wagener, Warrenville, SC 29851

Quarterly Floor Maintenance
Term Contract
Post-Bid
Eastover, SC 29044

Last Updated 04/01/2021 04:46 AM
Project Title

Cannons Elementary GYM Floor Replacement

Physical Address View project details and contacts
City, State (County) Spartanburg, SC 29307   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cannons Elementary School, located at 1315 Old Converse Road, Spartanburg, SC 29307, is in need of new gym flooring (approx. 5,700 sqft). The floor is a concrete slab. 1. All installation is to be performed in a professional manner by experienced flooring installers. 2. Contractor is to provide all labor, flooring, cove base, paint lines and transition strips as specified. - Flooring – WOODFLEX 6.7mm mats – 1001 MAPLE - Wall base – Johnsonite 4” Rubber cove base - Paint – standard basketball court markings 3. Contractor is responsible for removal and disposal of existing flooring, cove base and transition strips. 4. Contractor is responsible to move furniture if needed. The school is currently unoccupied during renovations. 5. Contractor is responsible for proper clean up and disposal of trash and remnants. 6. Work to begin on June 1, 2021 and be completed by June 6, 2021. 7. All floor preparation such as patching; repairing cracks, holes, etc. prior to installation is the responsibility of the Contractor.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents