Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

HVAC Maintenance-Greenville
Results
Greenville, SC

Courthouse Cooling Towers
Results
Greenville, SC 29607

Prisma Health Boiler Services
Post-Bid
Greenville, SC

Courthouse Roof - Mechanical
Results
Greenville, SC 29607

HVAC Upgrades at Fort Mill High School, B, C, and E Wings
Post-Bid
Fort Mill, SC 29715

Waste Water Treatment Services
Term Contract
Results
Greenville, SC 29601

HVAC Renovation Project at Berea Elementary School
Post-Bid
Greenville, SC 29617

HVAC Preventive Maintenance
Results
Greenville, SC

HVAC Renovation Project at Oakview Elementary School
Post-Bid
Simpsonville, SC 29681

HVAC System at Victor Gym
Results
Greer, SC

HVAC and Electrical Services
Term Contract
Post-Bid

HVAC Equipment and Installation
Results
Greenville, SC 29607

Partial HVAC Replacement at Blue Ridge Middle School
Post-Bid
Greer, SC 29651

Reported 05/31/2019 12:00 AM
Project Title

4 Exhaust Ventilation Systems for Mauldin Fire Department

Physical Address View project details and contacts
City, State (County) Greenville, Mauldin, SC 29662   (Greenville County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 05/06/19
Owner View project details and contacts
Architect View project details and contacts
Description Provide and install an emergency vehicle exhaust evacuation system at the following Fire Station(s): Headquarters Fire Station 9 East Butler Road, Mauldin, SC 29662 - provide four (4) source capture systems, four (4) tailpipe modifications, one (1) motor blower, and one (1) UL listed control panel. Station #1 Substation 802 Miller Road, Greenville, SC 29607 - provide two (2) source capture systems, two (2) tailpipe modifications, one (1) motor blower, and one (1) UL listed control panel. Station #2 300 Rocky Creek Road, Greenville, SC 29614 - provide four (4) source capture systems, four (4) tailpipe modifications, one (1) motor blower, and one (1) UL listed control panel. Station #3 1821 Bethel Road - Provide three (3) source capture systems, three (3) tailpipe modifications, one (1) motor blower and one (1) UL listed control panel.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents