Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

25th Street Hill Improvement
Infrastructure
Conception
$2,169,540 CJ est. value
Nazareth, PA 18064

Raubsville Road over Frey's Run
Demolition, New Construction, Infrastructure
Design
$2,493,630 CJ est. value
Williams Township, PA 18042

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Weona Park Concession Stand Improvements
Infrastructure
Bidding
$30,000 CJ est. value
Pen Argyl, PA 18072

2022 Sewer Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Wind Gap, PA 18091

AutoZone #1400 / Bethlehem
New Construction, Infrastructure - 5,654 SF
Post-Bid
$1,500,000 CJ est. value
Bethlehem, PA 18015

Rebid - Colonial Bathroom Replacement at the Louise Moore Park
Demolition, New Construction, Infrastructure
Post-Bid
$80,000 CJ est. value
Easton, PA 18045

WWTP Control Upgrades Project
Results
Bangor, PA 18013

WWTP West Influent Pump Room Upgrades - General Construction
Renovation
Results
$1,400,000 to $1,700,000 est. value
Bethlehem, PA 18015

2022 36 Minsi Trail Siphon South Access Improvements
Infrastructure
Construction
$77,400 CJ est. value
Bethlehem, PA 18018

Lehigh Valley Trade Center III
New Construction, Infrastructure - 540,000,000 SF
Pending Verification
$45,000,000 CJ est. value
Bethlehem, PA 18020

Banana Factory Arts & Education Center / Bethlehem
Demolition, New Construction, Infrastructure - 73,485 SF
Pending Verification
$22,000,000 CJ est. value
Bethlehem, PA 18015

WAWA / Nazareth Pike
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Bethlehem, PA 18020

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Last Updated 09/29/2022 03:25 PM
Project Title

WWTP Chemically Enhanced Primary Settling - Contract 1 - General Construction & Contract 2 - Electrical Construction

Physical Address View project details and contacts
City, State (County) Bethlehem, PA 18015   (Northampton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

WWTP Chemically Enhanced Primary Settling Project The bid will be awarded as two (2) individual prime contracts: Contract 1 - General Construction Contract 2 - Electrical Construction The City of Bethlehem encourages women and minority businesses to bid on City jobs. The Work to be performed for the 2022 45 WWTP Chemically Enhanced Primary Settling Project consists of the following: Provide materials and labor to install Chemically Enhanced Primary Treatment facility including tanks, piping, pumps, mixers, controls, and related improvements as outlined in the Plans and Specifications, as more particularly specified in the Contract Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents