Similar Projects
Last Updated | 04/21/2022 01:46 PM |
Project Title | 2022 Mildred Road Street and Water Project |
Physical Address | View project details and contacts |
City, State (County) | Cortez, CO (Montezuma County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes approximately: 14,000 SY of road reconstruction; trenching and backfill for 300 LF of 6” waterline; remove and replace 19 water service taps; install two 16” valves in conjunction with the City water crew. The reconstruction includes milling/removal of asphalt, recycle on-site Class 6, recondition subgrade, haul and place new Class 6, and repave. The project also includes: install 40 LF of 18” culvert pipe; remove and replace 260 SY of concrete flatwork, 93 SY of ADA ramps, and approximately 220 LF of curb. All work is in the City of Cortez. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |