Similar Projects
Natasha Drive Roadway Improvements
Infrastructure
Bidding
Auburn, GA 30011

Construction of a Bridge and Approaches on SR 82
New Construction, Alteration
Bidding
$4,000,000 est. value
Winder, GA 30680

T32-D4-Pavepres SR 90 Ben Hill 1408-24.31-113653
Post-Bid
GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

T32-D1-PCC-I-85 NB Banks-108410
Results
GA

T32-D1-PCC I-85 SB Banks-108414
Results
GA

Road Repair
Post-Bid
Auburn, GA

T32-D1-Pvmt Pres-SR 211 Barrow-110091
Results
GA

Pavement Rehabilitation-Building H Parking Area and Raymond Kelley Drive
Infrastructure
Post-Bid
Milledgeville, GA

Routine Maintenance - D6
Results
Cartersville, Holly Springs, GA 30120

Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services - District 1
Infrastructure
Post-Bid
GA

Resurfacing Improvements
Results
Less than $40,000 est. value
Ray City, GA

2021 Joint T-SPLOST
Infrastructure
Post-Bid
GA

Leveling and Resurfacing Improvements to Three City Streets
Results
Less than $80,000 est. value
Nashville, GA 31639

FY2022 LMIG - Widening of Old Alma-Waycross Highway
Infrastructure
Post-Bid
GA

Last Updated 05/06/2022 02:26 AM
Project Title

Church Street, Ivory Drive, and Lenora Lane Roadway Improvements

Physical Address View project details and contacts
City, State (County) Baldwin, GA 30511   (Habersham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of sections of asphalt pavement, placement of asphalt open graded crack relief interlayer on a portion of the pavement, and asphalt overlay on Church Street and Lenora Lane and placement of asphalt open graded crack relief interlayer with asphalt overlay on Ivory Drive. The Project consists of, but is not limited to the following major elements: Asphalt overlay of approximately 0.21 miles of Church Street, 0.19 miles of Ivory Drive, and 0.05 miles of Lenora Lane. Removal and replacement of sections of roadway on Church Street and Lenora Lane. Placement of asphaltic concrete open graded crack relief interlayer on portion of Church Street and Lenora Lane and all of Ivory Drive. Driveway tie-ins. Striping. Construction and permanent grassing of shoulders.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents