Boiler 8 Fd Turbine Repair
Alteration
Bidding
Madison, WI

Madison College, Commercial Avenue Boiler Replacement
Alteration
Bidding
$260,000 est. value
Madison, WI 53704

Motor Generator Upgrade
Renovation
Post-Bid
Madison, WI

Boilers and Installation of Boilers
Alteration
Post-Bid
Madison, WI 53705

Lakeside Cottage B Boiler Replacement
Results
Less than $232,000 est. value
Madison, WI 53704

Clean Sweep Building Boiler System
Results
Madison, WI 53718

Monona Terrace Heat Exchanger Maintenance
Alteration
Post-Bid
Madison, WI 53703

Biochemistry Cryo-Electron Microscopy Renovation -MEP
Results
Less than $1,400,000 est. value
Madison, WI 53706

2022 Annual Boiler Preventative Maintenance Service
Term Contract
Post-Bid
Madison, WI 53713

Heating Distribution Upgrades - MEP
Results
$2,870,000 est. value
Madison, WI 53705

Heating Distribution Upgrades - General
Results
$2,870,000 est. value
Madison, WI 53705

Green Bay Boiler Replacement
Results
$166,000 est. value
Madison, WI

Blower Motor Replacement/Installation
Results
Madison, WI 53701

Kennedy Elementary School Boiler Replacement 2021
Results
$325,000 est. value
Madison, WI 53714

Boiler Upgrade and Power Heating Installation
Alteration
Results
$1,357,000 est. value
Madison, WI 53704

Last Updated 04/27/2022 01:07 AM
Project Title

Pressure Reducing Valves Replacement Charter Street Heating Plant

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: The replacement of the existing primary campus steam desuperheater and its associated spray water control valve and piping with more appropriately sized components and furnishing an atomizing steam control valve and associated piping for the desuperheater. The work also includes the installation of a new desuperheater and associated spray water and atomizing steam control valves and piping at the boiler feed pump steam turbine drive steam supply line. The project will also replace 20" steam isolation valve and add an 8" steam isolation valve. Work is to be performed at the Charter Street Heating Plant. The desuperheaters, spray water and atomizing steam control valves, and steam isolation valves will be provided by the University for installation by the Contractor.

Details

Division 40 - Process Integration, Common Work Results for Process Integration, Common Work Results for Process Valves, Primary Control Devices, Primary Control Valves.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents