Similar Projects
Airfield Rehabilitation Program - Runway 2-20 - City of New Orleans
Infrastructure
Conception
$32,000,000 CJ est. value
New Orleans, LA 70130

Airfield Rehabilitation Program - Runway 11-29 - City of New Orleans
Infrastructure
Conception
$42,000,000 CJ est. value
New Orleans, LA 70130

3401 Saint Charles Avenue Mixed-Use Development
New Construction, Infrastructure - 19,000 SF
Design
$30,000,000 CJ est. value
New Orleans, LA 70115

Harold Gene Devore Playground
Infrastructure
Design
$230,000 CJ est. value
New Orleans, LA 70114

Inner Harbor Navigation Canal Lock 2023 Southwest Dolphin Replacements
Infrastructure
Bidding
$10,000,000 CJ est. value
New Orleans, LA 70112

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Greek Plots
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
New Orleans, LA 70122

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Results
$537,000 CJ est. value
New Orleans, LA 70118

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Results
$537,000 CJ est. value
New Orleans, LA 70118

2230 Magazine Mixed-Use
New Construction, Infrastructure - 15,000 SF
Pending Verification
$4,000,000 CJ est. value
New Orleans, LA 70130

Navy Office Complex Redevelopment - Phase 1
New Construction, Infrastructure - 40,000 SF
Pending Verification
$120,000,000 CJ est. value
New Orleans, LA 70117

DC Blox Data Center / New Orleans
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
New Orleans, LA 70112

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #22-2, Plaquemines Parish LA ED 21-022
Infrastructure
Design
$100,000,000 CJ est. value
New Orleans, LA 70118

Hibernian Memorial Park West End Boulevard
New Construction
Post-Bid
New Orleans, LA

Oak Park Drainage Improvements (Re-Bid)
Infrastructure
Results
$3,312,439 CJ est. value
New Orleans, LA 70112

Last Updated 07/26/2023 02:52 PM
Project Title

Gernon Brown Recreation Center New Play Structure

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70124   (Orleans County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $376,130 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following 1. The project is located within City Park N.O. and is adjacent to the Gernon Brown Recreation Center (NORD). The proposed project is an inclusive play structure with shade sails and poured-in-place rubber safety surfacing. The playground will be located within a group of existing Live Oak and Bald Cypress trees that shall be preserved and protected. The project includes the installation of benches, a trash receptacle and a standard NORD sign. Other site improvements include custom painted crosswalk on the existing concrete pavement to connect the proposed playground to the existing recreation center. The City reserves the right to reject any and all bids in accordance with the requirements of Louisiana Public Bid law. The City adheres to the Louisiana Code of Governmental Ethics, contained in the Louisiana Revised Statutes Annotated, R.S. 42:1101, et seq. By submitting a bid, prospective bidders warrants that there are no conflict of interest related to this solicitation that would violate applicable Louisiana Law. Violation of the Louisiana Code of Governmental Ethics may result in rescission of contract, permit or licenses, and the imposition of fines and/or penalties, without contractual liability to the public in accordance with applicable law. The City of New Orleans requires the payment of prevailing wage rates, as determined by the U.S. Department of Labor, to all workers on all construction projects in excess of $25,000. All general contractors and subcontractors must submit weekly Certified Payroll Reports on the wages paid to their employees Gernon Brown Recreation Center New Play Structure

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents