Similar Projects
Water, Sanitary Sewer, Drainage Facilities & Excavation To Serve Cliffstone Hills Section 1
Bidding
Houston, TX 77042

Water, sanitary Sewer and Drainage Facilities to Serve Grand Oaks Village Section 1
Bidding
Houston, TX

Construction of Sanitary Forcemain Facilities
Post-Bid
TX

Springwoods Village - CityPlace Roadways Phase III
Post-Bid
TX

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Katy Crossing Section 4
Results
Less than $970,634 est. value
TX

Construction of Sanitary Sewer Rehabilitation Phase II
Results
TX

Proposed Earth Movement Detention Basin, Offsite Storm Sewer, Water Line Connections and Sanitary Sewer Connections Serving WLY Commerce Park
Bidding
TX

Aboveground and Underground Utility Location Service for the TXDOT Houston District
Term Contract
Post-Bid

Wastewater Collection System Rehabilitation and Renewal
Results
$4,600,000 est. value
Houston, TX 77002

Proposed Waterline, Sanitary Sewer, Non-Potable Waterline, Storm Sewer and Paving Improvements on Bridgeland Prairieland Village Section 6
Bidding
TX

Informal Services Jet Sewer Cleaning
Post-Bid
Houston, TX 77252

Bridgeland - Parkland Village Section 41 Water, Sanitary Sewer, and Storm Sewer Utilities, Reinforced Concrete Pavement and Appurtenances
Results
TX

Sewer Cleaning, Hydro-Excavating, Inspection Equipment and Miscellaneous Services
Post-Bid
Houston, TX 77027

Water, Sanitary Sewer and Storm Sewer to Serve Forestwood Section 8
Results
TX

Pipeline and Sewer Rehabilitation
Post-Bid
Galena Park, TX 77547

Last Updated 12/18/2019 09:53 AM
Project Title

Texas Detention And Amenity Ponds, 6" Force Main, 12" Waterline Extension, 8" Sanitary Sewer, And Rehabilitation Of Existing 8" Sanitary Sewer

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes: 1. Approx. 199,126 CY Detention Pond Excavation 2. Approx. 2,084 LF of RCB storm sewer pipe and all appurtenances 3. Approx. 5,560 LF of 12-inch water line and all appurtenances 4. Approx. 320 LF of 8-inch sanitary sewer and all appurtenances 5. Approx. 4,243 LF of 6-inch sanitary sewer force main and all appurtenances 6. Approx. 1,606 LF of 8-inch sanitary sewer pipe burst to 10-inch and all appurtenances

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents