Similar Projects
May Street Elevated Sidewalk Replacement
Infrastructure
Design
$1,508,000 CJ est. value
Hood River, OR 97031

OR 281 at Orchard Road (Hood River)
Infrastructure
Design
$1,406,000 CJ est. value
Mount Hood Parkdale, OR 97041

Bonneville 1 Lamprey B-Branch Entrance Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Cascade Locks, OR 97014

Project Management Services for Hood River-White Salmon Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$520,000,000 CJ est. value
Hood River, OR 97031

Avalon Drive Paving Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Hood River, OR 97031

Hood River WWTP Digester Mixing System
Renovation, Infrastructure
Results
$2,972,000 CJ est. value
Hood River, OR 97031

2 nd and Oak Intersection Improvements
Infrastructure
Results
$867,875 CJ est. value
Hood River, OR 97031

RFQ Contractor - Bonneville Test Lab Building
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Cascade Locks, OR 97014

OR 281, OR282 and OR 35 Signs, Signals and Lighting
Infrastructure
Design
$811,876 CJ est. value
Hood River, OR 97031

RFQ Contractor - Bonneville Spillway Rock Removal FY23
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Cascade Locks, OR 97014

Bridge of the Gods Trailhead Parking Project
Infrastructure
Results
$496,487 CJ est. value
Cascade Locks, OR 97014

I-84: Ruckel Creek Culvert
Infrastructure
Design
$909,648 CJ est. value
Cascade Locks, OR 97014

Miscellaneous Truss Repairs for the Hood River-White Salmon Interstate Bridge
Infrastructure
Post-Bid
$800,000 CJ est. value
Hood River, OR 97031

I-84: Columbia River Hwy Culverts phase 2
Infrastructure
Design
$2,000,000 CJ est. value
Cascade Locks, OR 97014

St. Mary's Catholic Church
Addition, Demolition, Infrastructure - 3,628 SF
Design
$590,000 CJ est. value
Hood River, OR 97031

Last Updated 05/11/2023 12:05 PM
Project Title

May Street Townhouses

Physical Address View project details and contacts
City, State (County) Hood River, OR 97031   (Hood River County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 11, 2023, no building permits have been submitted to the City of Hood River. Construction could begin in fourth quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents