Similar Projects
Employee Parking Garage - Shelby County
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Memphis, TN 38103

Holmes Road - Shelby County
Infrastructure
Conception
$2,400,000 CJ est. value
Memphis, TN 38103

Mid-South Gifted Academy
New Construction - 10,580 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Collierville, TN 38017

18 Main Pinch District Phase 1 and 2
New Construction, Infrastructure - 976,000 SF
Design
$1,100,000,000 CJ est. value
Memphis, TN 38103

CMAR for Rehabilitation of Historic Melrose Building
Renovation
Post-Bid
Memphis, TN 38114

CCTE Classroom Repairs District 5
Renovation
Post-Bid
Arlington, Memphis, TN 38016

Practice Field Grading Services (12) Locations
Infrastructure
Results
TN

CCTE Classroom Repairs District 6
Renovation
Results
Memphis, TN 38116

Memphis Brooks Museum of Art
Demolition, New Construction, Renovation, Infrastructure - 112,000 SF
Construction
$150,000,000 CJ est. value
Memphis, TN 38104

Madison Lofts / Memphis
Demolition, New Construction, Infrastructure - 4,000 SF
Construction
$5,585,000 CJ est. value
Memphis, TN 38104

Glasgow PUD - Phase 1
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Germantown, TN 38139

New Stadium at Tobey Park - Shelby County Schools
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Memphis, TN 38112

Benjestown Pedestrian Bridge - Shelby County
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Memphis, TN 38127

Greyhound Station Redevelopment Project / Memphis
Demolition, New Construction, Infrastructure - 34,000 SF
Design
$40,700,000 CJ est. value
Memphis, TN 38105

CCTE Classroom Repairs District 9
Renovation
Post-Bid
TN

Last Updated 07/24/2023 03:10 PM
Project Title

Construction Manager at Risk (CMAR) New Frayser High School

Physical Address View project details and contacts
City, State (County) Memphis, TN 38127   (Shelby County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $90,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SCBE requests proposals for Construction Manager at Risk (CMAR) New Frayser High School. The specifications are contained in the Request for Proposal. Responses submitted must meet or exceed all requirements. Proposals that do not meet or exceed all requirements will be considered non-responsive. All exceptions must be noted. A Minority or Woman-owned Business Enterprises goal has been set for Construction Manager at Risk (CMAR) New Frayser High School project it is 23% Questions or requests for clarification of technical issues and terms pertaining to this RFP must be submitted in writing via e-mail to BRAXTONL @scsk12.org, and received by SCBE no later than July 13, 2023 @ 11:00 AM/CST A proposal submitted in response to this solicitation is binding upon the Vendor and is considered irrevocable for a minimum of 120 days following the closing date for receipt of initial proposals or the closing date for receipt of a best and final offer, if applicable. Vendors mailing proposals shall allow sufficient carrier delivery time to ensure timely receipt of their proposal Procurement Office after the submission deadline, no matter what the reason, will be returned unopened. Delivery to SCBE mailroom, lobby, etc. shall not constitute delivery The successful respondent are required to submit a performance and/or labor bond, Cashiers or Certified Check in the amount of one hundred percent (100%) as determined by SCBE and specified in the RFP, of all phases of the contract to ensure the satisfactory completion of the work for which a contract or purchase order is awarded that exceeds 100K

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents