Similar Projects
Target
Renovation
Design
Saint Louis Park, MN 55426

Manhole & Structure Coring And Sawing
Term Contract
Post-Bid
Minneapolis, MN 55401

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

2021 Parking Structure Rehabilitation
Construction
$2,408,193 est. value
Minneapolis, Saint Paul, MN 55111

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

Webber-44 (CSAH 152 & CSAH 57) Reconstruction
Results
Minneapolis, MN

Hot Poured Joint Sealer
Term Contract
Post-Bid
Minneapolis, MN

2021 Micro Surfacing and Chip Seal
Results
Champlin, Independence, Maple Grove, Minnetrista, MN

Pre-formed Expansion Joint Filler
Term Contract
Post-Bid
Minneapolis, MN

Grading, Bituminous Mill And Surfacing, Ada Improvements, And Signals
Results
MN

PAMS Cure Compound
Term Contract
Post-Bid
Minneapolis, MN

4th Street Reconstruction - 2nd Avenue North to 4th Avenue South
Results
Minneapolis, MN

Glenwood Grade Separation
Renovation
Post-Bid
Minneapolis, MN

Last Updated 03/22/2022 05:17 AM
Project Title

2022 Woodbine Area Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Brooklyn Center, MN   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major Items of Work: Excavation: 6,730 C.Y. Pipe Lining: 11,370 L.F. Hydrant Replacements: 24 EA. Gate Valve Replacements: 49 EA. Curb Stop Replacements: 249 EA. Bituminous Pavement Reclamation: 46,970 S.Y. Bituminous Pavement: 11,650 TONS Concrete Curb and Gutter: 2,630 L.F. Concrete Driveway Aprons: 530 S.Y. Concrete Sidewalk: 16,810 S.F. Sodding: 10,560 S.Y.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents