Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Clear Creek Crossing Project
Post-Bid
Wheat Ridge, CO

10 Burnett SMS Access Controls Conversion project
Post-Bid
Durango, CO

Installation of Coaxial Cables for NIST Timescale
Results
Boulder, CO 80305

Design/Build - Electrical Distribution System Replacement-Pueblo Academy of Arts
Results
Pueblo, CO 81005

Electrical Services
Term Contract
Post-Bid
Pueblo, CO

Uninterruptible Power Supply (UPS) Units
Term Contract
Results
Pueblo, CO

Led Loft Theatre Lighting
Post-Bid
Boulder, CO

Electrical Contractors/Upgrade Fire Alarm Mass Notification
Results
Less than $740,000 est. value
Golden, CO

Standby Power Generator Installation at Health and Human Services Building
Alteration
Post-Bid
Pitkin, CO 81611

Mechanical and Electrical Upgrades at 3 Troop Offices
Results
Less than $62,000 est. value
Lakewood, CO

Removal of Existing Fluorescent Fixtures and the Installation of Led Lights and Fixtures
Alteration
Post-Bid
Crested Butte, Gunnison, CO 81224

Cafeteria Lighting System Replacement at South High School
Results
Pueblo, CO 81005

Edgewater Civic Center Solar Energy
Alteration
Post-Bid
Edgewater, CO 80214

Last Updated 05/17/2022 11:14 AM
Project Title

Prime General Contractor for 2022 Theatrical Lighting at Thunder Vista P-8 Music

Physical Address View project details and contacts
City, State (County) Broomfield, CO 80023   (Broomfield County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The work as described herein shall be furnished and installed by one (1) firm alone. The Theatre Contractor shall furnish and install all equipment Theatre Systems described herein. The Theatre Contractor further agrees that they shall provide all Work as may be required to make a complete and fully functioning system of that which may not be fully defined in the Contract Documents. 2. It is the responsibility of the Theatre Contractor to furnish and install all steel not shown on the structural drawings but required for complete performance lighting position installation. 3. The Theatre Contractor shall verify the completeness of the parts list and furnish necessary accessories to execute the intent of the plans and specifications. 4. The specifications and drawings shall be read and used together, system features which are mentioned in one are not necessarily shown in the others. In case of conflict between the drawings and specifications, request clarification. It shall be understood that the Equipment Lists, Specifications and Drawings are complementary. Where there are conflicts within the documents, request clarification. 5. The Work shall be provided complete, and the systems shall be fully operational as shown on the Theatre Systems drawings and described herein.6. The project documentation is, in general, diagrammatic and/or developed to communicate design intent. The Theatre Contractor shall coordinate the installation of all devices and/or equipment with the Owner prior to installation based on the existing field conditions. 7. The Theatre Contractor shall coordinate all installed items with associated trades (electrical, mechanical, structural, AV, telecom, etc.) including all necessary cable pass-thrus and structural needs/requirements. 8. The Theatre Contractor shall provide all software programming required to provide fully operational systems. 9. The Theatre Contractor shall coordinate the specific programming requirements of the Theatre Performance Lighting Control System with a designated Owner representative, including touchscreen layouts and page navigation. All programming written for this project shall be the property of the Owner and shall be provided to the Owner upon completion.

Details

Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Theatrical Lighting Controls, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents