Project Title | Sewer Plant Chiller |
Physical Address | View project details and contacts |
City, State (County) | Muskogee, OK 74401 (Muskogee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $77,088 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | If You Have Any Questions About This Bid or Would Like a Copy of This Bid, Please Contact the Projects Department, 301 S. Cherokee St., Muskogee, Ok (918-684-6212) or Email Awallace@muskogeeonline.org Any Questions Regarding This Bid Please Contact Jimmy Thomason at 218-220-0835. City of Muskogee Reserves the Right to Accept or Reject Any and/or Part of All Bids, and to Waive Irregularities at Its Discretion. The City of Muskogee Reserves the Right to Accept a Bid Other Than the Lowest Bid, With Justification, as Provided by the City's Purchasing Policy. A Bidder Wishing to Appeal a Bid Award Must Present a Written Appeal to the City Manager Within Five (5) Days of the Bid Opening. Each Proposal Must Be Accompanied by a Bidder's Bond or Cashier's Check Upon Any Solvent Bank or Trust Company, Payable Without Reserve to the City of Muskogee, Oklahoma, in an Amount Not Less Than Five Percent (5%) of the Total Amount of the Bid. Bid Security of the Two (2) Low Bidders Will Be Retained Until Approval of Contract and Execution of Satisfactory Bonds by the Successful Bidder, or Until Other Disposition on the Bids is Made. - Lock out and tag the power supply for the space heaters in the boiler room - Supply & Install three (3) Trane fan motors for the space heaters - Restore power, check motor rotation and operation - Remove existing piping and re-pipe the supply to the water softener back flow preventer - Supply & install piping materials and water regulatorto add make up water to the boiler loop - Pressurize new piping, leak check and set pressure regulator - Lock out power supply to multi zone AHU - Supply and install up to six (6) actuator motors for the AHU - Supply and install up to six (6) thermostats and wiring forfrom the thermostats to the actuators - wire the thermostats and actuators, power the circuits and check operation - wire the thermostats and actuators, power the circuits and check operation - Lock out the water supply to AHU 1 - Remove the piping and the existing damaged coil(s) from AHU lin the boiler room - Supply and install new Trane coil(s) for AHU 1 in the boiler room - Connect new coil(s) to the existing piping, restore the water supply, pressurize and leak check connections - Clean up and remove all debris |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |