Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

Water Reclamation Facility Dewatering Centrifuge Replacement - WW0326 - City of Norman
Renovation
Design
$2,500,000 CJ est. value
Norman, OK 73072

Water Treatment Plant Residuals Removal
Infrastructure
Bidding
$500,000 CJ est. value
Fort Gibson, OK 74434

WWTP Lagoon Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Shidler, OK 74652

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

2021 CDBG Wastewater Treatment Improvements
Renovation
Post-Bid
$500,000 CJ est. value
Grandfield, OK 73546

Kingfisher WWTP Rehabilitation
Renovation
Results
Kingfisher, OK

Holdenville Wastewater Treatment Plant Improvements
Renovation
Results
Holdenville, OK 74848

Hochatown - Offsite Improvements - WP #1 - Access Roadway & Facility Maintenance Building
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Hochatown, OK 74728

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

Lynn Lane WWTP Filter Press Replacement Procurement
Renovation
Post-Bid
$610,000 CJ est. value
Broken Arrow, OK 74011

Lynn Lane WWTP East Clarifier Rehabilitation
Infrastructure
Results
Broken Arrow, OK 74011

Adams Creek Basin Study - City of Marianna
Infrastructure
Post-Bid
$1,415,000 CJ est. value
Broken Arrow, OK 74012

Last Updated 11/23/2022 09:08 AM
Project Title

Sewer Plant Chiller

Physical Address View project details and contacts
City, State (County) Muskogee, OK 74401   (Muskogee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $77,088 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

If You Have Any Questions About This Bid or Would Like a Copy of This Bid, Please Contact the Projects Department, 301 S. Cherokee St., Muskogee, Ok (918-684-6212) or Email Awallace@muskogeeonline.org Any Questions Regarding This Bid Please Contact Jimmy Thomason at 218-220-0835. City of Muskogee Reserves the Right to Accept or Reject Any and/or Part of All Bids, and to Waive Irregularities at Its Discretion. The City of Muskogee Reserves the Right to Accept a Bid Other Than the Lowest Bid, With Justification, as Provided by the City's Purchasing Policy. A Bidder Wishing to Appeal a Bid Award Must Present a Written Appeal to the City Manager Within Five (5) Days of the Bid Opening. Each Proposal Must Be Accompanied by a Bidder's Bond or Cashier's Check Upon Any Solvent Bank or Trust Company, Payable Without Reserve to the City of Muskogee, Oklahoma, in an Amount Not Less Than Five Percent (5%) of the Total Amount of the Bid. Bid Security of the Two (2) Low Bidders Will Be Retained Until Approval of Contract and Execution of Satisfactory Bonds by the Successful Bidder, or Until Other Disposition on the Bids is Made. - Lock out and tag the power supply for the space heaters in the boiler room - Supply & Install three (3) Trane fan motors for the space heaters - Restore power, check motor rotation and operation - Remove existing piping and re-pipe the supply to the water softener back flow preventer - Supply & install piping materials and water regulatorto add make up water to the boiler loop - Pressurize new piping, leak check and set pressure regulator - Lock out power supply to multi zone AHU - Supply and install up to six (6) actuator motors for the AHU - Supply and install up to six (6) thermostats and wiring forfrom the thermostats to the actuators - wire the thermostats and actuators, power the circuits and check operation - wire the thermostats and actuators, power the circuits and check operation - Lock out the water supply to AHU 1 - Remove the piping and the existing damaged coil(s) from AHU lin the boiler room - Supply and install new Trane coil(s) for AHU 1 in the boiler room - Connect new coil(s) to the existing piping, restore the water supply, pressurize and leak check connections - Clean up and remove all debris

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents