Similar Projects
Utilities - US 60
Infrastructure
Design
Less than $971,698 est. value
Ponca City, OK 74601

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Construction for Bridge 236AA Over Unnamed Tributary of Bols D'arc Creek
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Newkirk, OK 74647

Construction for Bridge 236AA Over Unnamed Tributary of Bols D'arc Creek
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Newkirk, OK 74647

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Joint Seal/Repair
Infrastructure
Results

6th Street – Fresno Ave to Hartford Ave
Infrastructure
Results
Ponca City, OK

US 11 - Utilities
Infrastructure
Design
$1,859,044 CJ est. value
Ponca City, OK 74601

RFQ Construction Manager at Risk - Tonkawa Urgent Care Clinic and Pharmacy
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Tonkawa, OK 74653

Resurface (Asphalt) I-35 from 1.0 Mile South of US-60 Extend North Near Tonkawa and Blackwell
Post-Bid
OK

Resurface (Asphalt) I-35
Infrastructure
Results
OK

Bridge Rehabilitation - US 60
Infrastructure
Design
$3,759,812 CJ est. value
Ponca City, OK 74601

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Slabjacking and Subsealing Services
Infrastructure
Results

Last Updated 09/28/2022 03:34 AM
Project Title

Street and Waterline Improvement Project-NE Woodland to El Camino

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all tools, materials and labor and performing the work necessary to construct approximately 830 linear feet of new 8 inch PVC AWWA C900, DR18 water line and to reconstruct approximately 3,740 square yards of 7 inch concrete pavement on Hartford Avenue from NE Woodland Road to El Camino Street. Work includes all valves, fiffings, connections, fire hydrants and all appurtenances required for a complete water line installation and abandonment of existing deteriorated 8 inch water line. Work also includes all excavation, base preparation, drives, sidewalks, wheelchair ramps and traffic striping as specified in the plans for the complete roadway reconstruction. A cashier's check, a certified check or a security bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to unsuccessful bidders. Telephone messages should be directed to the City Engineer's Office at (580) 767-0333.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents