Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Paved Town Trail Phase III
Infrastructure
Post-Bid
Brian Head, UT

Y--Three Peaks SRMA Redevelopment
New Construction
Results
$500,000 to $1,000,000 est. value
Cedar City, UT

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

Center Street Tree Grate Installation and Sidewalk Repair Project - 2022
Infrastructure
Post-Bid
Cedar City, UT

SR -14 Woods Ranch EB Passing Lane
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

Asphalt Street Crack Seal Chip Seal Asphalt Oil Applicator Crack Sealant Chip Seal Oil Materials
Infrastructure
Post-Bid
Cedar City, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Storm Drain Improvements Project - Center Street Concrete Inlet and Outlet Structures 2022
Infrastructure
Post-Bid
$400,000 CJ est. value
Cedar City, UT 84720

SR-14 SR-148 to Mammoth Crk Rd and MP 36.8 to US-89
Infrastructure
Results
$6,000,000 to $10,000,000 est. value

On-Call Task Order Soft-Surface Trail System Maintenance and Related Services
Term Contract
Post-Bid
$177,256 est. value
Cedar City, UT

Last Updated 02/01/2023 01:10 PM
Project Title

Frontier Homestead Museum Area Painting and Grounds Improvements

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84721   (Iron County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Museum, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $289,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes addition of concrete walking path at exterior interpretative area, refinish of existing concrete floor in the main museum, replacement of flat roofs at both east and west porches of the main museum and full scrape and re-paint of the exterior of the main museum.Construction Cost Estimate: $295,000.00 Question Submission Close Date 1/17/2023 3:00 PM MST

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents