Similar Projects
Low-Medium Voltage Electrical Equipment Maintenance, Repair and Testing
Alteration
Bidding
Broken Arrow, Catoosa, Tulsa, OK 74117

Low-Medium Voltage Electrical Equipment Maintenance, Repair and Testing
Alteration
Bidding
Broken Arrow, Catoosa, Tulsa, OK 74117

Installation of Solar Electric Power System
Post-Bid
Wright City, OK

Power Converter Maintenance for Fort Sill, Oklahoma
Post-Bid
Fort Sill, OK

Right-Of-Way Clearance
Results
OK

Electrical Upgrades to the James D Couch Municipal Office Building 420 West Main
Alteration
Results
$276,250 est. value
OK 73102

Underground Power Line
Term Contract
Bidding
Seminole, OK

Electrical Contractor
Post-Bid
Muskogee, OK

City Hall Landscape/Lighting Parking Improvements
Infrastructure, Alteration
Results
Less than $177,615 est. value
Broken Arrow, OK 74011

Overhead Power Lines
Term Contract
Bidding
Seminole, OK

Supply and Install Overhead Fiber
Term Contract
Post-Bid
Claremore, OK 74017

Electrical Maintenance/Repair Services for City Owned Facilities
Alteration
Results
Stillwater, OK

Repair Hangar Lighting
Term Contract
Bidding
$100,000 to $250,000 est. value
Enid, OK 73703

GNAS Mechanical + Electrical Upgrade at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
Renovation
Post-Bid
$2,000,000 to $3,000,000 est. value
Oklahoma City, OK 73169

Transmission Line Pole Replacement (Phase III)
Alteration
Results
Marlow, OK

Last Updated 10/13/2021 10:10 AM
Project Title

B-52 Lab Conduit & Cable Installation

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73145   (Oklahoma County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 76 SoftWare Engineering Group (SWEG) requires the installation of conduit to building 3220 and the installation of coax within to support the expansion of the B-52 labs. With the exception of materials provided in the Government Furnished Materials (GFM) attachment the Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the conduit installation and running of coax at the Oklahoma City–Air Logistics Complex (OC-ALC)

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents