Reported | 11/19/2021 12:00 AM |
Project Title | 800 KW Peak Shaving Standby Generation System |
Physical Address | View project details and contacts |
City, State (County) | Greenville, NC (Pitt County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 800 kW peak shaving/standby generation system will be a complete turnkey design-build project. The generator engines will be fired by 100% natural gas. The work shall include the furnishing of all materials, equipment, installation, testing and commissioning of equipment. The system shall consist of one or multiple generators. The project design shall incorporate means for potential future expansion of additional peak shaving/standby generation. The 800 kW peak shaving/standby generation system will be sourced from a 15 kV 1/0 underground feeder and connected to a 1,000 kVA (277/480 grounded wye) step up transformer. These Technical Specifications cover the design, manufacture, delivery, installation, testing and commissioning in good order of a new 800 kW Peak Shaving/Standby Generation System at the property of Greenville Utilities Commission. The Materialman shall erect the engine-generator(s) and generator switchgear(s), control house (if required) plus provide and install wiring for power and controls. The Materialman shall also provide all miscellaneous hardware, electrical connectors, conduits, conductors, control cables and ancillary equipment for a complete project. The work shall include furnishing all materials, supervision, labor, tools, equipment, and supplies necessary for the complete installation of the electrical generation system as shown or called for in the Drawings and/or Specifications. The Bid Schedule includes the complete installation of the Peak Shaving/Standby Generation System and its ancillary equipment. The Materialman shall install the engine generator set; silencer and exhaust system; control and protection switchgear; outdoor sound attenuated weatherproof enclosure; steel reinforced concrete foundations, fuel connections, fuel storage tanks (if applicable) or other fuel related systems as may be required. The Materialman is responsible for site preparation, foundation design, unloading and installing the engine-generator set and switchgear, service power and control wiring between the engine-generator and switchgear, power wiring throughout. enclosure, and providing, installing, and terminating 480V power conductors, and control cables between the engine-generator/switchgear/utility transformer,. Project location: 711 Utility Way, Greenville, North Carolina. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |