Similar Projects
Waterline Replacement
Bidding
$25,000 to $100,000 est. value
WV

Right Fork Water Line Extension Project
Post-Bid
Danville, WV

Blennerhassett Condensing Water Piping Replacement
Post-Bid
Parkersburg, WV

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Meter Improvements - Central Boaz Public Service District
Post-Bid
Vienna, WV

East Martin Street Utility Relocation
Results
$542,955 est. value
Martinsburg, WV 25401

Water Infiltration Elimination and Construction at Morgantown High School
New Construction, Infrastructure
Post-Bid
Morgantown, WV

Proposed Water Line Replacements
Results
McMechen, WV 26040

Beartown Herndon Heights Waterline Extension Project
Infrastructure
Post-Bid
Stephenson, WV

Contract #1 - Overall Water System Extension
Results
Clarksburg, WV 26422

Water Meters
Infrastructure
Post-Bid
Sistersville, WV

Sistersville Water Supply Project
Results
Less than $1,593,000 est. value
Friendly, WV 26146

Water System Improvements Contract Nos 1, 2, and 3
Infrastructure
Post-Bid
New Cumberland, WV

Tyler County Public Service District's Ben's Run Line Relocation
Results
Less than $55,000 est. value
Sistersville, WV

Last Updated 09/16/2021 10:58 AM
Project Title

Water Distribution System Emergency Repairs

Physical Address View project details and contacts
City, State (County) Walton, WV   (Roane County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work being bid will include: modify pressure reducing vault No. 1 and pressure reducing vault No. 2; repair 2 separate waterline stream bank "washouts" by replacing existing exposed piping by directional drilling; repair 1 waterline stream bank "washout" by reconstructing and armoring streambank; repair and rehabilitate Ambler Ridge water storage tank, including installation of a temporary pressurized storage tank and refurbishing Gandeeville water storage tank, including installation of a temporary storage tank; installation of a new telemetry system at ten (10) separate locations; installation of 2 new 8-inch gate valves and 2 new 6-inch gate valves; mobilization; preconstruction video taping, site sign and all other items and appurtenances shown on the plans or detailed in the specifications that are necessary for a complete and operable water system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents