Similar Projects
270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

County Forces Projects - Rivershore Road Flood Repair
Infrastructure
Design
$207,595 est. value
Clearview, WA 98290

Water Filter Plant Portal 4 Improvements Project
Renovation, Infrastructure
Bidding
$3,963,000 CJ est. value
Monroe, WA 98272

Heritage Park & Church Creek Park Sports Courts
Infrastructure
Bidding
$200,000 CJ est. value
Stanwood, WA 98292

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

Rainier Street Utility Improvements
Infrastructure
Bidding
$2,100,000 CJ est. value
Snohomish, WA 98290

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Station 50 - Waterline Extension
Infrastructure
Results
Arlington, WA 98223

SR 526 Corridor Improvements
Infrastructure
Design
$39,197,000 CJ est. value
Everett, WA 98203

Last Updated 09/30/2022 12:09 PM
Project Title

96th Avenue Infiltration

Physical Address View project details and contacts
City, State (County) Edmonds, WA 98020   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $389,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of the 96th Ave Infiltration Project and the furnishing of all labor, materials and equipment necessary for this project. Bidders shall submit an origina l bid in a sealed envelope labeled with the bidders name and project title The proposed work entails installation of a new infiltration facility beneath the 96th Ave ROW adjacent to Yost Park. The project will install new infiltration chambers with a stormwater pretreatment facility, install new catch basins and piping, orifices, and connections to route stormwater to the chambers and back to the existing 24-inch stormwater pipe. This project also includes site demolition, temporary erosion and sediment control, tree protection, tree removal, excavation and backfill, stormwater piping, infiltration chambers, catch basins, a stormwater pre-treatment facility, connection to existing stormwater system, manholes, and gravel surfacing. ARPA (Federal) funding wTill be utilized for this project. The project is eligible for ARPA funding under EC 5.6 with the proposed work described above. Online Bid Opening Info : Join Zoom Meeting https:// usOdwehzqonLu^ pwd=OxIuOvJPM4YgaGaMlToO d4kkbbpCnu.l&from~addon 2022. Meeting ID: 793 5141 5935 _________________ 10/4(409704) Passcode: 5ZL8CP Please address any comments and questions you may have to Kyle Woods, Planner and Capital Project Manager, at kyle.woods@.edmondswa.gov or 425-599-3847. Plans, specifications, addenda, bidders list and plan holders list for this project are available through the City of Edmonds online plan room. Free of charge access is provided to Prime Bidders, Subcontractors and Vendors Edmonds City Hall is closed toall visitors as a precaution to miti- gate the spread of COVID-19. In order to provide a fair and trans- mg procedures will be in place A certified check, cashiers check or bid bond in the amount, equal to at least five percent of the total amount, of bid, including sales tax if applicable, must accompany each bid as evidence of good faith and as a guarantee that, if awarded the contract, the bidder will execute the contract and give a performance and payment. bond as required. The check will be given as a guarantee thathe bidder shall execute the contract in conformity with the contract documents if it is awarded to him and shall provide a perormance and. payment bond as pecified therein within ten calendar days after notification of the award of contract to the bidder. The City of Edmonds reserves he right to reject any or all bids, and to waive irregularities or informalities in the bid or in the bidding. No bidder may withdraw his bid after the hour set for the opening thereof or before award of contract, unless said award is delayed for a period exceeding sixty calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents