Similar Projects
Steven L. Josias Dog Park Parking Lot Expansion and Drainage Improvements
Infrastructure
Bidding
$375,000 est. value
Southwest Ranches, FL 33332

Orange County Cady Way Trail Drainage Improvements
Infrastructure
Bidding
$235,000 est. value
Winter Park, FL 32792

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Lake Bank Repairs
Post-Bid
FL

SPC Stem Center Living Shoreline
Results
Less than $100,000 est. value
Saint Petersburg, FL 33733

Lake Okeechobee Corp Island Re-Shaping
Results
$62,500 est. value
FL

Escribano Point Erosion Control
Term Contract, Infrastructure
Bidding
$200,000 est. value
Milton, FL 32583

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

Lake Mangonia Shoreline Stabilization
Results
West Palm Beach, FL 33401

Dinner Island (Grove Entrance Culverts)
Infrastructure
Bidding
Tallahassee, FL

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
Results
$5,000,000 to $10,000,000 est. value
FL

Ditch Maintenance
Infrastructure
Bidding
$200,000 est. value

SNL Phase V Drainage Improvements
Post-Bid
Sebring, FL

Lift Station F04 Seawall Replacement
Results
$45,000 est. value
Merritt Island, FL 32940

Last Updated 11/02/2021 10:38 AM
Project Title

Ashley Plantation Pond Repairs

Physical Address View project details and contacts
City, State (County) Milton, FL   (Santa Rosa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

During Hurricane Sally the pond berm in the Ashley Plantation Phase 2 Pond was blown out due to overtopping of the pond. This project is for pond repairs and reconstruction of the pond berm to get the pond back in service in line with the original design. The project includes, but not limited to the reconstruction of the berm with a clay core, de-mucking the pond and restoring to its original condition, remove and replace the sand filter and a bid option to replace the skimmer if warranted.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents