Similar Projects
Last Updated | 11/02/2021 10:38 AM |
Project Title | Ashley Plantation Pond Repairs |
Physical Address | View project details and contacts |
City, State (County) | Milton, FL (Santa Rosa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | During Hurricane Sally the pond berm in the Ashley Plantation Phase 2 Pond was blown out due to overtopping of the pond. This project is for pond repairs and reconstruction of the pond berm to get the pond back in service in line with the original design. The project includes, but not limited to the reconstruction of the berm with a clay core, de-mucking the pond and restoring to its original condition, remove and replace the sand filter and a bid option to replace the skimmer if warranted. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |