Similar Projects
Jamestown Dam Outlet Works Stilling Basin Concrete Floor Repairs
Results
$500,000 to $1,000,000 est. value
Jamestown, ND

McDowell Dam Bank Stabilization 2021
Results
$106,000 est. value
Bismarck, ND

P--Bone Hill NWR - Dam Breach Construction
Renovation
Results
ND

Pipestem Dam Spillway Modifications
Renovation, Term Contract
Post-Bid
$100,000,000 to $250,000,000 est. value
Jamestown, ND 58401

Construction of NAWS South Prairie Reservoir and Control Structure-General Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Construction of NAWS South Prairie Reservoir and Control Structure - 10.5 MG Wire-Wound Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical, Electrical and Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical and Electrical Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Baldhill Dam Ogee Spillway Concrete Repair Project
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Valley City, ND 58072

Drayton Dam Fish Passage Mitigation
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
Drayton, ND

Underground Tunnel 2022 Albrecht Boulevard - Phase 3
New Construction
Results
$1,305,000 to $1,415,000 est. value
Fargo, ND 58125

Last Updated 04/05/2022 01:56 PM
Project Title

Red River Structure - FMM Area Flood Risk Management

Physical Address View project details and contacts
City, State (County) Fargo, ND   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Red River Structure (RRS) of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. The RRS’s main function is to control the amount of flow entering the benefitted area where the Red River passes through the dam. The RRS will include a gated structure, dam walls, vehicle service bridge, mechanical platform bridge, stilling basin, dentated end sill, downstream retaining walls, approach apron, slope protection slab and approach walls. The structure includes three 50-foot wide Tainter gates, two 12-foot wide concrete piers between them, and abutments on the east and west side of the structure. The RRS also includes a control building, access roads, approximately 3,000 feet of engineered channel, and approximately 2,000 feet of borrow ditch channel.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents