Similar Projects
OR47: Nehalem River Bridge Project on the Nehalem Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

Coleman Ck. (Phoenix) Project on the Rogue Valley Highway (Rt. No. OR99)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Phoenix, OR

Canby Marquam Highway Bear Creek Bridge
New Construction, Infrastructure
Bidding
$1,485,000 est. value
Canby, OR 97013

Southern Oregon Seismic Bridge Retrofit (Phase 2)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

GAOA Burnt Cabin Trail Bridge Replacement
New Construction
Design
$250,000 to $500,000 est. value
Milton Freewater, OR

US26: Ten Eyck/wolf DR Vista Loop (Sandy) Sec
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

US30: Snake River (Ontario) Bridge Project on the Ontario Spur Highway (Rt. No. US30)
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

OR6: Mills (Wilson River) Bridge Project on the Wilson River Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

Old Highway 99N: Oakland Bridge and Melrose Road: Conn Ford Bridge Project Oakland Shady Highway
New Construction, Infrastructure
Results
OR

OR47: West Fork Dairy Creek Bridge Section of the Nehalem Highway
New Construction
Bidding
$2,000,000 to $5,000,000 est. value
OR

US199: Holton Cr Pedestrian Bridge (Kerby) Project
New Construction, Infrastructure
Results
$500,000 to $1,000,000 est. value
OR

Latourell Creek Bridge
New Construction, Infrastructure
Results
$950,000 to $1,050,000 est. value
Corbett, OR 97019

Walla Walla River Road Bridge
New Construction, Infrastructure
Results
$500,000 to $600,000 est. value
Milton Freewater, OR

US 30 - NW Kittridge Avenue to NW Bridge Avenue Sec
New Construction, Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
OR

OR82: Bear Creek (Wallowa River) Bridge Project on the Wallowa Lake Highway (Rt. No. Or82) Near Wallowa
New Construction
Results
$10,000,000 to $20,000,000 est. value
OR

Last Updated 01/17/2022 02:30 AM
Project Title

OR153 Salt Creek Bridge Project on the Bellevue Hopewell Highway

Physical Address View project details and contacts
City, State (County) OR   (Yamhill County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 1,620 hrs train.; 700 ft2 temp. signs; 4 ea PCMS; 160 hrs flag.; const. & rem. temp. acc. rd.; temp. wrk. br.; temp. wrk. acc. & contain.; 270 yd2 matting; 21 ea chk. dam; 589 ft comp. fltr. berm; 102 ft sed. fence; 500 ft sed. barr.; turb. mntr.; const. surv. wrk.; 3,516 yd3 exc.; 803 yd3 st. emb.; 2,440 yd2 subg. stab.; 3,213 yd2 geot.; 789 yd3 riprap; 249 ft pipe; 116 ft2 pv. end slp.; 50 yd2 trnch. resurf.; br. rem. wrk.; 1,534 yd3 str. exc.; 1,370 yd3 gran. str. backfill; furn. drill. equip.; 295 yd3 drill. shft. conc.; 90,000 lb drill. shft. reinf.; 2,266 ft CSL tubes; 6 ea CSL tests; 507 ft drill. shft. exc.; 216 ft perm. shft. cas.; furn. pile drv. equip.; 2,706 ft furn. stl. piles; 32 ea drv. stl. piles; 271,812 lb reinf.; 476 yd3 deck conc.; 572 yd3 gen. str. conc.; 1,971 yd3 saw cut text.; 293 yd2 reinf. conc. br. end pan.; 649,679 lb str. stl.; 4 ea br. drains; 24 ea bear. dev.; 87 ft strip seals; 951 ft 3 tube stl. rl.; 95 ft fence; 170 ft dr. stl. pil.; 490 yd2 CPPR; 2,130 ton aggr. base; 1,030 ton ACP; 7 ea asph. appr.; 109 ft conc. curb; 175 ft gd. rl.; 4,261 ft paint striping; 0.72 yd3 conc. in sign sup.; 627 lb stl. in sign sup.; 85 ft2 signs; 2.3 acres seeding; 93 yd3 topsoil; 2,590 ea plants; 13 yd3 comp. mulch. Completion Time: September 30, 2023. Class of Work: Bridges and Structures

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents