Similar Projects
Cornucopia - Port Wing Construction / Resurface
Infrastructure
Conception
$4,000,000 est. value
Ashland, WI 54806

Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Timeless Timber Site Residential Redevelopment
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Ashland, WI 54806

Cornucopia - Superior Constr / Culvert Restore and Replace
Infrastructure
Design
$1,000,000 CJ est. value
Ashland, WI 54806

RFP Engineering - Rehabilitation - Ancillary
Infrastructure
Bidding
$3,000,000 CJ est. value
Highbridge, WI 54846

RFP Engineering - Rehabilitation - Ancillary
Infrastructure
Bidding
$3,000,000 CJ est. value
Highbridge, WI 54846

LRIP Project - Carlson Road
Infrastructure
Post-Bid
Ashland, WI 54806

County Trunk Highway GG Improvement Project 2022
Infrastructure
Post-Bid
$400,000 est. value
Clam Lake, WI 54517

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

CTH N Asphalt Resurfacing
Results
Ashland, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Construction of State Street LRIP Improvement Project - 2022
Infrastructure
Post-Bid
$140,000 est. value
Ashland, WI 54806

Lenz Road Improvement
Results
Glidden, WI 54527

Dust Abatement
Infrastructure
Post-Bid
La Pointe, WI

Last Updated 01/12/2023 07:37 AM
Project Title

Blacktopping

Physical Address View project details and contacts
City, State (County) Morse, WI 54546   (Ashland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $752,870 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Town of Morse, Ashland County, Wisconsin is accepting sealed HOT MIX ASPHALT bids for the pulverizing, adding to base, and paving of 2.66 miles of West Lake Drive in the Town of Morse, Wisconsin for a Wisconsin DOT Intermodal/LRIP funded project. Project to be completed during 2023 construction season. Work is to include pulverizing the existing blacktop. Add 4 of base to improve pulverized base. Fine grade, water and compact base to prepare it for placement of hot mix asphalt. Pave with 3 1/2 compacted hot mix asphalt in 2 lifts with SS1H tack coat between layers. Construct a 2 gravel shoulder, 4 deep using 3/ gravel. Road mark painting should also be included for center line only. This project is to be bid using both unit prices per ton of placed hot mix asphalt made from WDOT approved mix design and total project bid cost. The Town Board reserves the right to accept or reject any and/or all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents