Similar Projects
Small Structure Replacement and Pipe Lining - SR 39
Infrastructure
Bidding
$1,303,253 CJ est. value
Monticello, IN 47960

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022-2 Paving Project
Infrastructure
Post-Bid
$400,000 est. value
Reynolds, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Asphalt Resurface - US 24
Infrastructure
Results
IN

White County Coroner's Office & Pole Barn Storage Facilities (Bid Package #2)
Addition, Demolition, Build-out, Renovation, Infrastructure - 3,222 SF
Post-Bid
$300,000 CJ est. value
Monticello, IN 47960

Intersection Improvement, Roundabout
Infrastructure
Results
$47,637,101 CJ est. value
Monticello, IN 47960

Bridge Replacement - SR 39
Demolition, New Construction, Infrastructure
Post-Bid
$1,592,870 CJ est. value
Monticello, IN 47960

Pavement Patching
Infrastructure
Results
$6,986,640 CJ est. value
Round Grove, IN 47923

White County 2022-2 CCMG
Infrastructure
Post-Bid
Monticello, IN 47960

RCA Neighborhood Drinking Water Improvements Phase 2
Infrastructure
Results
$4,936,840 CJ est. value
Monticello, IN 47960

Community Crossings Paving Program
Infrastructure
Post-Bid
$400,000 CJ est. value
Monticello, IN 47960

Repair or Replace Joints and Small Structure Maintenance
Infrastructure
Results
$297,209 CJ est. value
Reynolds, IN 47980

2022-2 Street Paving
Infrastructure
Post-Bid
$200,000 CJ est. value
Reynolds, IN 47980

Last Updated 03/27/2023 08:42 AM
Project Title

Street Improvements For N. Prairie Street

Physical Address View project details and contacts
City, State (County) Brookston, IN 47923   (White County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes paving various streets throughout the town, work may consist of milling, cleaning, tack coat, surface and binder courses through the town. Prevailing wages are not required. The work to be performed and the proposal to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. No bid will be considered unless submitted on the printed Proposal Form found in the project manual. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least 90 days to allow review of proposals before announcing award of contract. Each proposal shall be accompanied by a bid guaranty conforming to the Indiana Revised code. Said bid guaranty shall be a certified check in an amount equal to five percent (5%) of the BID; or, a bond for five percent (5%) of the BID as surety for the execution of the contract. The bid bond or certified check should be made out to the OWNER. The bid bond form is included in the bidding documents. Should any BID be rejected, such certified check or bond shall be forthwith returned to the BIDDER, and should any BID be accepted, such certified check or bond will be returned upon the proper execution and securing of the contract. When the contract is executed, the certified check or bid bond of all unsuccessful BIDDERS will be returned. Proposals shall be properly and completely executed on proposal forms included in the Specifications. Proposals shall include all information requested by Indiana Form 96 (Revised 2010) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. A copy of the proposed Financial Statement to be submitted with the bid is included in the bid proposal documents section to these specifications. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. The contractor to whom the work is awarded will be required to furnish, before commencing work, a performance, maintenance and payment bond in an amount equal to the bid price of the contract awarded to said contractor, and certificates of all insurance required in the specifications. All bonds and liability insurance shall remain in effect for a period of twelve (12) months following completion and acceptance of construction. The award of the contract is subject to all approvals required by local and federal agencies. Upon securing of all approvals, the successful bidder shall receive a "Notice to Proceed" with construction and said contractor shall begin construction within ten (10) days of receipt of such notice, and shall complete the project pursuant to the contract documents. Each bidder is responsible for inspecting the Project Site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to the Bid. A conditional or qualified Bid will not be accepted. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout. Award will be made to the low, responsive, responsible bidder. Award will be made to the low, responsive, responsible bidder. Project Examined Address: : Town of Brookston 205 E 3rd Street, Brookston, Indiana 47929.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents