Similar Projects
East Gym Renovation - Essex Community School District
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Essex, IA 51638

Wastewater Treatment Plant Upgrades - City of Shenandoah
Renovation, Infrastructure
Design
$19,700,000 CJ est. value
Shenandoah, IA 51601

Bridge Replacement - PPCB
Demolition, New Construction, Infrastructure
Bidding
$7,500,000 CJ est. value
Yorktown, IA 51632

Bridge Replacement - PPCB
Demolition, New Construction, Infrastructure
Bidding
$7,500,000 CJ est. value
Yorktown, IA 51632

Charles E Lakin Foundation Child and Fimily Center New Office Building
New Construction, Infrastructure
Post-Bid
$1,300,000 CJ est. value
Clarinda, IA 51632

Department of Correction (DOC) Clarinda Correctional Facility (CCF) Kitchen and Laundry Addition
Addition, Demolition, New Construction, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Clarinda, IA 51632

PCC Patching
Infrastructure
Results

Glenn Miller Avenue Improvements
Infrastructure
Results
$739,295 est. value
Clarinda, IA 51632

2021 Street Resurfacing
Infrastructure
Pending Verification
$500,000 CJ est. value
Shenandoah, IA 51601

2021 Street Resurfacing
Infrastructure
Pending Verification
$500,000 CJ est. value
Shenandoah, IA 51601

Clarinda Correctional Facility (CCF), Clarinda Treatment Complex (CTC), NE and SW Porch Repairs
Demolition, Renovation, Infrastructure
Bidding
$350,000 CJ est. value
Clarinda, IA 51632

Clarinda Alley Improvements Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Clarinda, IA 51632

HMA Patching - U.S. 71
Infrastructure
Results
IA

Clarinda Academy Expansion
New Construction, Infrastructure
Pending Verification
$100,000 CJ est. value
Clarinda, IA 51632

Bridge Replacement - PPCB - IA 48
Demolition, New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Essex, IA 51638

Last Updated 06/20/2023 01:53 PM
Project Title

150th Street Bridge - County of Page

Physical Address View project details and contacts
City, State (County) Essex, IA 51638   (Page County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.kmaland.com/news/page-county-board-awards-contract-for-essex-west-bridge-project/article_db2336f4-5b86-11ed-9cf0-3f3c11f3370f.html (Clarinda) -- After years of planning, work is set to begin on a bridge replacement project west of Essex. During its regular meeting Tuesday, the Page County Board of Supervisors approved an award of contract to A.M. Cohron and Son, Inc. of Atlantic totaling just over $2.8 million for replacing the Essex West Bridge on 150th Street over the East Nishnabotna River. County Engineer J.D. King tells KMA News the Iowa Department of Transportation let the project for bids in October. He says the current 235-foot long and 20-foot wide bridge was built in 1937 and is no longer adequate for today's vehicles and farm equipment. "The existing bridge is narrow and weight limited and it's one of the older bridges that Page County has crossing the East Nishnabotna," King explained. "There's one at 110th Street, one on D Avenue north of Essex, there's the one on 150th Street that we're replacing and under contract now, and then there's the A Avenue bridge north of Shenandoah near Rapp Park." advertisement King says correspondence for the replacement project dates back to December 2019. However, the county won't be alone in funding the project. Due to its location, the city of Essex is providing $1 million in city-bridge funds. "Essex annexed 80 acres a couple of years ago so half of (the bridge) is in city limits," he said. "That allows them to tap into the state of Iowa's city-bridge fund, and they've done their paperwork." He adds the additional funding source is critical in funding a multi-million dollar project such as this and frees up other county bridge funds. He adds Page County typically only receives between $600-700,000 a year. After a pre-construction meeting next week, King expects the contractors to begin work this winter and potentially later this month for the new 454-foot long and 34-foot wide bridge. "There's a large amount of dirt to move and they'll want to move that before it freezes and also do some clearing and grubbing of some of the trees inside the work area," said King. "Then we'll do foundation work of the footings and piers in the river during the winter when there's low flow conditions. That way we don't have to fight the water quite so bad." He adds the actual deck placement will begin in the spring of 2023. While the new bridge likely won't have as much traffic as a similar-sized bridge north of Essex, King says they want to take advantage of the funds at their disposal. King notes the plan is similar to three other extensive bridge replacements during his time in the county. "Two on the Nodaway (River) -- one at Shambaugh and one at Clarinda -- and a large north of Shenandoah, we did the same schedule on that," he explained. "Working in the winter on the foundations, piers, and abutments, and set the beams in the spring and then place the deck in the spring." He says the hope is to have the bridge completed and back open to traffic by the summer of 2023. _____________ Project calls for a bridge replacement on 150th street. As of May 4, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. As of April 17, 2023, no new information available

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents