Similar Projects
2021 Sewer Line Rehabilitation Project
Bidding
Clifton, CO 81520

2021 Preventative and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

Cherry Creek Interceptor Project
Post-Bid
Parker, CO

Storm Drainage Rehabilitation and Improvements
Results
Longmont, CO 80501

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

Cherry Creek Interceptor Project - Trenchless Construction Portion
Post-Bid
Parker, CO

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

2020 Sikis Subdivision Sewer Replacement Project Phase II
Post-Bid
Cortez, CO 81321

Reported 03/20/2020 12:26 PM
Project Title

Stormwater Facility Maintenance

Physical Address View project details and contacts
City, State (County) Canon City, CO   (Fremont County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

annual contract for general maintenance on Stormwater properties in and around the City. This work generally consists of the rubbish removal, vegetation management, and maintenance of detention basins, drainage channels, and other related stormwater properties that the City of Cañon City operates or maintains. The range of work to be covered by this contract consists of furnishing all labor, tools, equipment, materials, fuel, mobilization, and performing all operations and services in connection with the removal of rubbish, vegetation cutting, and maintenance of the specified detention basins and drainage-ways.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents