Similar Projects
Bridge Rehabilitation Over Route 6
New Construction, Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

Bridge Rehabilitation Over Route 6
New Construction, Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

Bridge Replacement Over Chipman Road
New Construction, Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
MO

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Washington County Bridge Replacement
Results
Potosi, MO

3 Bridge Rehabilitations
New Construction, Infrastructure
Bidding
$750,000 to $1,000,000 est. value
Saint Charles, MO

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

14 Bridge Rehabilitations
New Construction, Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
Saint Louis, MO

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Highland Pedestrian Bridge
New Construction
Results
Saint Joseph, MO

Reported 10/05/2021 12:00 AM
Project Title

Callaway County Replacement Bridge No. 4440016

Physical Address View project details and contacts
City, State (County) Fulton, MO   (Callaway County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes the construction of a 120’-0” long, single span, Prestressed Concrete NU63 Girder bridge at 20 degree skew and 0% grade, located on County Road 1051 over Loutre River in Callaway County MO.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents