Similar Projects
Greenwood Solar I
New Construction, Infrastructure
Conception
$130,000,000 CJ est. value
Culpeper, VA 22701

Greenwood Solar I
New Construction, Infrastructure
Conception
$130,000,000 CJ est. value
Culpeper, VA 22701

Dominion Apartments
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Culpeper, VA 22701

Aspen Street Apartments
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Culpeper, VA 22701

Well Installation and Well Abandonment
Infrastructure
Bidding
$20,000 CJ est. value
Culpeper, VA 22701

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Conventional Onsite Sewage System Installation Project
Infrastructure
Results
$16,000 CJ est. value
Rixeyville, VA 22737

Clevenger's Village - Site Development
New Construction
Construction
$13,000,000 est. value
Culpeper, VA

Head Start School Addition / Culpeper
New Construction, Infrastructure - 6,174 SF
Pending Verification
$1,500,000 CJ est. value
Culpeper, VA 22701

Kite Acres
New Construction, Infrastructure
Pending Verification
$23,869,511 CJ est. value
Culpeper, VA 22701

Culpeper Sports Complex Athletic Field Lighting - County of Culpeper
Infrastructure
Conception
$2,150,000 CJ est. value
Culpeper, VA 22701

Tidal Wave Auto Spa
New Construction, Infrastructure - 3,600 SF
Design
$950,000 CJ est. value
Culpeper, VA 22701

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

Last Updated 02/20/2023 03:10 PM
Project Title

Maroon Solar Project

Physical Address View project details and contacts
City, State (County) Culpeper, VA 22701   (Culpeper County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Zoning Variances, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new 149 MW solar facility. The project includes photovoltaic panels, a substation, communications and facility control systems and equipment, an interconnection switchyard, unpaved access roads, grassy driving aisles, and gravel entrances from public roads, chain-link security fencing, stormwater and erosion and sedimentation control features and basins and several container-sized storage containers placed on for spare parts and materials. The project will be completed in three phases of construction over three years. As of February 2023, the project application has been withdrawn and the owner is expected to prepare a new application to conform to the new county solar ordance. Information regarding the architect and general contractor have not been determined. Although a firm timeline for construction has not been determined, construction is not expected to begin before fall 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents