Similar Projects
Handcox Water Treatment Plant Process Building HVAC Improvement Project
Bidding
Less than $539,289 est. value
Austin, TX

Gessner DL HVAC #4 Replacement
Alteration
Bidding
Austin, TX

Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

Steiner Elementary HVAC Update
Post-Bid
Austin, TX 78732

Air Filter Changing Services
Results
Less than $122,790 est. value
Austin, TX 78711

MEDEX Sobriety Center Chiller Upgrade
Results
Less than $235,000 est. value
Austin, TX 78701

Building Management System Maintenance, Diagnostics and Repair Services, Austin SSLC
Alteration
Bidding
Austin, TX 78703

HVAC and Roof Replacement Project
Term Contract
Post-Bid
Austin, TX 78746

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

HVAC Upgrade, Flight Services
Post-Bid
Less than $293,000 est. value
Austin, TX 78744

Ballroom Feasibility and Roof Replacement
Term Contract
Results
Less than $1,755,000 est. value
Austin, TX 78701

CCRC Walk-in Cooler/Freezer
Post-Bid
Austin, TX 78756

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Envelope Services
Post-Bid

Bauer Compressor Maintenance
Results
Less than $5,000 est. value
Austin, TX 78767

Last Updated 07/27/2021 04:45 AM
Project Title

Roof and HVAC Replacement, Austin DHQ

Physical Address View project details and contacts
City, State (County) Austin, TX 78753   (Travis County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $274,580
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removing the Existing Foam and Built-Up Roofing System including Insulation Down to the Existing Metal Decking. Remove all Existing Metal Fascia, Gutters, and Downspouts. Install New Polyisocyanurate Insulation, Polyisocyanurate Tapered Insulation (1/8" / 1'-0") as Indicated, 1/2" Cover Board, and New 60 Mil. Fleece Backed, Class "A" Fire Rated, Mechanically Fastened. Fm-I90 Single-Ply Roofing System, Install all New Prefinished Metal Fascia, Gutters and Downspouts with a 2 Coat Fluorocarbon Painted Finish. Close Off all Abandoned Penetrations Prior to installation of New Roof System. Provide New Pre-Cast Concrete Splash Blocks at the Bottom of all Downspout for Design Building. Replacement in Kind of Four (4) Roof Top Air Conditioner Heatpump Units at Admin Building

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents