Similar Projects
Rancho Conejo Boulevard
Renovation, Addition, Demolition - 13,300 SF
Design
$2,000,000 est. value
Thousand Oaks, CA 91320

Rancho Conejo Boulevard Industrial Buildings
New Construction
Design
$30,000,000 est. value
Thousand Oaks, CA 91320

Blending Station 1 Automatic Transfer Switch and Panel Replacement Project
Alteration
Bidding
$200,000 est. value
Oxnard, CA 93030

Civic Center West Wing Elevator Renovation Project
Term Contract
Post-Bid
$200,000 est. value
Oxnard, CA 93030

Generator and Automatic Transfer Switch (ATS) Maintenance
Alteration
Post-Bid
Camarillo, CA

Fixed Camera Infrastructure Project
Alteration
Results
Port Hueneme, CA

Electrical System Repair Services in Los Angeles ,Ventura ,and Kern Counties
Alteration
Results

On Call Repair and Maintenance Services for Cogenerators and EMD Generators Project
Term Contract
Post-Bid
Oxnard, CA 93033

Moorpark College Entry Marquee Sign
Renovation, Alteration
Results
$200,000 to $225,000 est. value
Moorpark, CA 93021

Electrical Services
Alteration
Post-Bid
Ventura, CA 93003

Moorpark College Wayfinding Signage
Renovation, Alteration
Results
$725,000 to $775,000 est. value
Moorpark, CA 93021

Electrical System Repair Services
Alteration
Results

East Portal Isolation Enhancements
Alteration
Results
$420,000 est. value
Ventura, CA

On Call Electrical Repair Maintenance and Replacement Services
Term Contract, Alteration
Results
Less than $750,000 est. value
Oxnard, CA 93030

Bldg 1388 Data Center UPS Services
Term Contract
Results
Port Hueneme, CA

Last Updated 07/22/2022 08:33 AM
Project Title

Warehouse 1A Demolition Phase 1 - Electrical Refeed

Physical Address View project details and contacts
City, State (County) Port Hueneme, CA 93041   (Ventura County)
Category(s) Industrial/Manufacturing, Single Trades
Sub-Category(s) Electric, Industrial Warehouse
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,984,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 14, 2022 , this project has not yet been awarded. The project is expected to be awarded on July 18, 2022. The Warehouse 1a Demolition Phase 1: Electrical Refeed Project, Will Refurbish Existing Feeder Located in Existing Main Switchgear to Feed a New Power Distribution Switchgear Feeding the New Reefer Switchgear and Lighting Panel. Provide New Power Distribution System to Install Two Portable Reefer Outlet Units, With Associated Switchgear and Underground Power Distribution. Re-feed Three (3) Existing Crane Instrumentation Charging Outlets Boxes From a New Power Panel. Provide Three New High Mast Light Stub for Future Electrical Connection. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 05/24/2022 5:00 PM (PDT) estimated cost is in the range between $1,000,000 and $3,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall complete all Work required by the Contract Documents within 180 calendar days

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents