Similar Projects
Last Updated | 07/10/2020 12:00 PM |
Project Title | Maxwell Creek Lift Station Bypass Pump |
Physical Address | View project details and contacts |
City, State (County) | Allen, TX 75002 (Collin County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: Community Services staff have identified the following items that must be included on the unit purchased by the bidder: Prime-assisted Centrifugal Pump 1. Silent pack, sealed unit to combat noise 2. Lockable door panels 3. Unit must have its own control float(s) or level transducer 4. Unit must be an automatic start with ability to pump in conjunction with existing wet well pumps 5. Existing Pumps are 2,280 GPM @ 60 TDH 6. Preferred Intake and Discharger at 8”, or another size not smaller than 6” 7. UL Double Wall Fuel Tank with a minimum 100-gallon capacity 8. Ability to run at full load for approximately 24 hours 9. Ability to manage 23.5’ of Suction Head 10. Motor Options – 110V Block Heater and 12V Battery Trickle Charger. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |