Similar Projects
I-285 WB Ashford Dunwoody Road Ramp Extension
Bidding
GA

DeLesseps/LaRoche Avenue from Waters Avenue to Skidaway Road
Bidding
Savannah, GA 31400

Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Emmanuel Seventh Day Adventist Church Parking Lot Expansion
New Construction
Construction
Lithonia, GA 30058

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

EP-177 Washington Road Sidewalks
Bidding
East Point, GA

Concrete Walkway - Governors Drive
Post-Bid
Forest Park, GA 30297

Construction of Streetscape and Atlanta Highway Sidewalk Phase II
Term Contract
Results
Bogart, GA 30622

Arena Surface Lot
Bidding
Savannah, GA

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Parking Lot at Tom Pittman Field
Results
Aragon, GA 30104

Roadway Improvements For Holmesville Road
Bidding
Jesup, GA

Reported 02/17/2021 12:00 AM
Project Title

North 4Th Avenue Drainage And Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Rome, GA   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of approximately 340 linear feet of reinforced concrete pipe within the roadway of North 4th Avenue along with associated drainage structures, the removal and replacement of 30-inch concrete curb and gutters and drives, the installation of P.V.C. conduits for the future installation of underground power, and the installation of concrete sidewalks with a decorative brick band. A handicap ramp is required at the street intersection of North 4th Avenue and West 4th Street and is required to be constructed in full and complete compliance with GDOT Standard Details as well as current ADA requirements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents