Similar Projects
Nature Trail Repairs and Upgrades - City of Knoxville
Infrastructure
Conception
Less than $1,300,000 est. value
Knoxville, TN 37920

Ragsdale Road - 311-43100-1050 - City of Brentwood
Infrastructure
Conception
$10,600,000 est. value
Brentwood, TN 37027

DeSoto Lofts Mixed-Use
Renovation, Infrastructure - 13,828 SF
Design
$2,800,000 est. value
Memphis, TN 38103

Old Solomon Mill Road Over Branch
Infrastructure
Bidding
$400,000 est. value
Somerville, TN 38068

Trash Dumpster Addition
Infrastructure
Bidding
$300,000 est. value
Dandridge, TN 37725

RS-2 Seal and Emulsified Asphalt
Term Contract, Infrastructure
Post-Bid
Springfield, TN 37172

Streets Repaving
Post-Bid
Henning, TN

2021 Contracted Paving Area 35B
Results
Kingsport, TN

Street Patch and Repair
Results
$200,000 est. value
Piperton, TN

Asphalt - Paving in Place
Term Contract
Post-Bid
TN

37th Avenue & Tigerbelle Drive Improvements
Results
Nashville, TN

Asphalt Patching of Utility Cuts in-Place
Term Contract
Post-Bid
Alcoa, TN

FY 2021 Asphalt Paving, North Section
Results
Memphis, TN 38103

Micro-Surfacing
Term Contract
Post-Bid
Carthage, TN

Hicks Street Over Br-Rutherford Fk Obion River
Results
TN

Reported 07/20/2022 12:00 AM
Project Title

East Apron Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Lebanon, TN 37090   (Wilson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of mill and overlay of approximately 18,700 square yards of paved aircraft parking and maneuvering area on the east side of the airport (East Apron), including connector taxiway A1 joining the East Apron to the airport's main Runway 1-19, along with parts of two connector taxiways (Taxiway A2 and Taxiway A3 from the airport's main runway to its parallel taxiway totaling another approximately 2,000 square yards. Removal of existing tie-downs and installation of new tie-downs with new configuration. Minor grading to the south of the Apron.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents