Similar Projects
Bridge Reconstruction
New Construction, Infrastructure
Bidding
Grand Blanc, MI 48439

White Road Bridge Replacement
New Construction, Infrastructure
Bidding
$438,307 est. value
MI

Dix Road, Grosse Ile and Jefferson Ave Lift Bridge Services
Term Contract
Post-Bid
Detroit, Melvindale, MI 48122

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Porcupine Mountains Wilderness State Park, Iron Belle Trail Pedestrian Bridge
Results
Ontonagon, MI 49953

Fish Dam Creek Crossing - Bridge/ Culvert
Results
MI

Bridge Removal and Replacement with Approach Work on Belgiumtown Road over Little Cedar River and North N-3 Lane over Little River
New Construction, Infrastructure
Bidding
MI

Hay Creek Bridge Improvements
Renovation
Post-Bid
Hamburg, MI

Baraga to Arnheim Rail Trail - Phase 3 Trestle Deck Repair Over Little Carp River
Results
MI

Operation of Bascule Bridges Bay Region Bay County
New Construction, Infrastructure
Post-Bid
MI

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Balsa Wood (TRAC Bridge Building Component) FY22
New Construction, Infrastructure
Post-Bid
MI

Removal of Existing Structure and Bridge Replacement at Cadillac Avenue, Frontenac Avenue, and Burns Avenue
Results
Detroit, MI

0.13 Mi of Bridge Rehabilitation and Road Reconstruction Including Replacing the Bridge Decking With Laminated Wood and Steel Grating, Hot Mix Asphalt Cold Mill and Resurface, Concrete Curb and Gutter and Pavement Markings
New Construction, Infrastructure
Post-Bid
Allegan, MI

Bridge Rehabilitation to include Overlay, Waterproofing Membrane, Guardrail, Expansion Joint Replacement and Concrete Surface Coating on Various Routes at 13 Structures
Results
MI

Last Updated 02/17/2022 09:13 AM
Project Title

Menominee River Bridge Phase II Abutment and Pier Repairs

Physical Address View project details and contacts
City, State (County) Iron Mountain, MI 49801   (Dickinson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work, the Menominee River Bridge Phase II Abutment and Pier Repairs, includes, but is not necessarily limited to: Tuck point and joint repairs of abutment and pier stone joints both aboveground and underwater, temporary scaffolding or supports, and clearing. The site is located on the Menominee River near Iron Mountain, MI and is located in both Michigan and Wisconsin (border project) approximately 1/3 mile southwest of US-2. Take US-2 to Pine Mountain Road. Take Pine Mountain Road southwest approximately 1800 feet to the rail road grade and turn right. Bridge is ahead approximately 1800 feet.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents