Similar Projects
Taylor Street Railroad Drainage Repair
Infrastructure
Bidding
SC

Silver Creek Box Culvert
Infrastructure
Bidding
Central, SC 29630

Pipe Cleaning and Lining
Post-Bid
Columbia, SC 29202

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

FY20 Clouter Creek North Cell Ditching
Results
$500,000 to $1,000,000 est. value
Charleston, SC 29403

Maplewood Drive Culvert Replacement
Results
Lyman, SC 29365

Shoreline Stabilization-Lake Greenwood State Park
Infrastructure
Bidding
$200,000 to $225,000 est. value
Ninety Six, SC 29666

Campus Village Residential Development - South Tunnel Stabilization
Post-Bid
$600,000 to $800,000 est. value
Columbia, SC 29208

USDA-FS Sumter NF Culvert FSR 665A Replacement
Results
$25,000 to $100,000 est. value
Edgefield, SC 29824

HCS Transportation Training Pad
Term Contract
Bidding
Conway, SC 29526

Wells Japanese Garden Pond Renovation
Post-Bid
Newberry, SC 29108

Precast Reinforced Concrete Floorless Culvert-Arch Box Type
Results
Pickens, SC 29671

Provide Rentention/Detention Pond Maintenance Service - District Wide
Infrastructure
Bidding
Andrews, Georgetown, Hemingway, Pawleys Island, SC 29510

Shoreline Stabilization Project
Post-Bid
Georgetown, SC 29440

Installation of Drainage System in Playground Area
Results
Florence, SC 29063

Reported 12/08/2021 12:00 AM
Project Title

Cambridge Drainage System Installation

Physical Address View project details and contacts
City, State (County) Honea Path, SC 29654   (Anderson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a Cambridge Drainage System on the soccer and softball fields at Belton Honea Path High School. Mobilize staff and equipment. . Stip sod in a 7' width parallel to the sideline fencing on both sides ofthe field to allow minimum disturbance by equipment during collector line installation. . Install 6" solid wall HDPE for collector line approximately 4' offthe fence. The outfall will daylight into adjacent pond. . Install Cambridge drainage system. This consist oflateral lines (corrugated 50mm pipe) on 7' spacing at a 14" depth running from sideline to sideline across the field and connecting to the collector line. These lines are backfilled with 4" of drainage rock and 10" ofUSGA sand. Drain lines will be left exposed with sand. Bermuda grass will cover lines during the growing season typically within 3 weeks. Spoils from dug lines will be hauled off site. . Provide and install hybrid 419 Bermuda sod over collector line disturbance. . Clean up any disturbance made during constructio

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents