Reported | 12/08/2021 12:00 AM |
Project Title | Cambridge Drainage System Installation |
Physical Address | View project details and contacts |
City, State (County) | Honea Path, SC 29654 (Anderson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install a Cambridge Drainage System on the soccer and softball fields at Belton Honea Path High School. Mobilize staff and equipment. . Stip sod in a 7' width parallel to the sideline fencing on both sides ofthe field to allow minimum disturbance by equipment during collector line installation. . Install 6" solid wall HDPE for collector line approximately 4' offthe fence. The outfall will daylight into adjacent pond. . Install Cambridge drainage system. This consist oflateral lines (corrugated 50mm pipe) on 7' spacing at a 14" depth running from sideline to sideline across the field and connecting to the collector line. These lines are backfilled with 4" of drainage rock and 10" ofUSGA sand. Drain lines will be left exposed with sand. Bermuda grass will cover lines during the growing season typically within 3 weeks. Spoils from dug lines will be hauled off site. . Provide and install hybrid 419 Bermuda sod over collector line disturbance. . Clean up any disturbance made during constructio |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |