Similar Projects
7-Eleven
New Construction - 3,200 SF
Conception
Melbourne, FL 32901

7-Eleven
New Construction - 3,200 SF
Conception
Melbourne, FL 32901

Titusville Point Master Plan
New Construction - 18,365 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Titusville, FL 32780

Winn-Dixie
Renovation - 27,071 SF
Design
Viera, FL 32955

RaceTrac #0456
Renovation - 5,259 SF
Post-Bid
West Melbourne, FL 32904

Cumberland Farms Gas Station, Convenience Store with Dining
New Construction - 8,348 SF
Post-Bid
$950,000 est. value
Rockledge, FL 32955

Aldi #85 - Viera
New Construction - 17,000 SF
Construction
Melbourne, FL 32935

Publix #1214 - Loading Dock Enclosure
Renovation
Construction
$266,000 est. value
Satellite Beach, FL 32937

Space Coast Town Centre Master Plan
New Construction
Conception
West Melbourne, FL

Winn-Dixie
New Construction, Renovation - 27,071 SF
Design
Melbourne, West Melbourne, FL 32904

Gas Station and Convenience Store
New Construction - 5,100 SF
Post-Bid
Cocoa, FL 32927

Love's Travel Stops & Country Stores #868
New Construction - 11,857 SF
Construction
$1,690,000 est. value
Mims, FL 32754

Murphy Express #8967
New Construction - 2,800 SF
Design
$500,000 to $1,000,000 CJ est. value
Cocoa, FL 32922

Target #0934- Grocery PickUp
Renovation - 304 SF
Post-Bid
Melbourne, FL 32940

Cumberland Farms
New Construction - 5,625 SF
Construction
$950,000 est. value
Titusville, FL 32780

Reported 04/27/2020 01:17 PM
Project Title

Circle K

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 34683   (Brevard County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method
Project Status Building in Operation as of March 2020
Bids Due View project details and contacts
Estimated Value $932,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Gas Station, New Construction, 14 Fuel Pump(s), 1 Supermarket/Convenience Store, Demolition Building, 1 Supermarket/Convenience Store, 1 Story Above Grade, 5,319 SF New Construction Fuel Pump(s), 3.43 Acres.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Structure Demolition, Building Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents