Similar Projects
Harmony Ridge Neighborhood Park
Infrastructure
Design
$300,000 CJ est. value
Windsor, CO 80550

RFP Engineering - Highland Hills 47th Avenue Sewer Capacity Improvements
Infrastructure
Bidding
$1,220,000 CJ est. value
Greeley, CO 80634

Job Order Contractor - Horizontal/Civil
Infrastructure
Bidding
Erie, CO

2022 Signal Detection Upgrade Project
Infrastructure
Sub-Bidding
$280,000 CJ est. value
Greeley, CO 80631

2022 Signal Detection Upgrade Project
Infrastructure
Sub-Bidding
$280,000 CJ est. value
Greeley, CO 80631

Environmental Assessment for Construction and Demolition Projects at the 233rd Space Group Greeley Air National Guard Station
Renovation, Demolition
Post-Bid
Greeley, CO 80631

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Asbestos Abatement - Spark Discovery Pre-School
Results
Frederick, CO 80530

Water and Soil Testing WCAO 2022
Results

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

Delantero Master Planned Community
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Greeley, CO 80631

Teague Recharge Facility Project
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Firestone, CO 80520

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

UC Site Improvements
Infrastructure
Results
$350,000 est. value
Greeley, CO

Last Updated 08/09/2022 08:31 AM
Project Title

35th Ave 8th St (Franklin Middle School) Hawk Signal

Physical Address View project details and contacts
City, State (County) Greeley, CO 80634   (Weld County)
Category(s) Heavy and Highway, Outdoor Lighting, Single Trades
Sub-Category(s) Environmental, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City has programmed a High Intensity Activated Cross Walk (HAWK) beacon on 35th Avenue at the 8th Street crossing to enhance safety for the Franklin Middle School activities. HAWK warrants have been met based on the traffic conditions, street geometrics, and the number of crossings within the peak periods. City staff have worked with the District #6 representatives during the design process and have notified adjacent residents about the installation. Question Acceptance Deadline 08/19/2022 04:00 PM EDT Questions are submitted online No

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents