Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Cleaning Services - Unoccupied Units At All Four Complexes
Term Contract
Bidding
NC 28359

Mallard Creek Wastewater Treatment Plant Ruvi: Bid Packages No. 7A And 7B
New Construction
Bidding
Charlotte, NC

Lyons Science Center Comprehensive Renovation
Renovation
Post-Bid
Fayetteville, NC 28301

Odor and Corrosion Control Services
Post-Bid
Raleigh, NC 27610

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Mocksville-Dutchmans Creek WWTP Renovation
Results
$3,300,000 est. value
Mocksville, NC

McAlpine Creek WWMF Nutrient Harvesting
Bidding
$13,000,000 est. value
Charlotte, NC

Smith Creek RRF Influent Screenings, Pumping and Grit Removal Improvements
Post-Bid
Wake Forest, NC

NCSU Fountain Dining Hall
Renovation
Results
Raleigh, NC 27695

Remove and Replace Bridge 53 Over Cold Water Creek with a Prestressed Girder Bridge
New Construction
Bidding
Kannapolis, NC 28083

56--Office Dividers
Post-Bid
Fort Bragg, NC

Black River WWTP Aeration System Replacement
Results
$2,500,000 to $2,649,400 est. value
Dunn, NC 28334

NC Aquarium at Pine Knoll Shores Wastewater Maintenance
Term Contract
Bidding
Pine Knoll Shores, NC 28512

Reported 10/30/2020 12:00 AM
Project Title

WWTP Improvements Contract I

Physical Address View project details and contacts
City, State (County) Mount Olive, NC 28365   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project will include clearing, grubbing, removal and disposal of approximately 145.5 acres of existing hybrid sycamore crop, removal and disposal of existing drip irrigation lines, installation of new spray irrigation lines and spray guns, temporary erosion control measures, and preparation/planting of irrigation fields with Coastal Bermuda grass crop. Work also includes installation of new control valves, concrete housing pads, and FRP covers, blowoff assemblies, air release valves, and drain valves.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents