Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Infrastructure Investment and Jobs Act - Environmental AE MATOC
Renovation, Term Contract
Design
Less than $45,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Engineering Design/Bid Assistance for Replacement of Water Main
Post-Bid
Addison, IL

C--Multiple Award Task Order Contract (MATOC) for Geotechnical Engineering Service
Results
$500 to $25,000,000 est. value

Indefinite Delivery/Indefinite Quantity (IDIQ), Multi-Discipline Architect-Engineer (A-E) Services for Facilities Primarily Located In Maine, New Hampshire, Connecticut, Rhode Island, New York, New Jersey
Post-Bid
$2,000,000 to $10,000,000 est. value

Engineering Consultant: Planning, Design and Construction Phase Services CIP
Results
IL

Sidewalk Design Services - Norfolk Street from Saratoga to Main
Post-Bid
Downers Grove, IL

Various Phase II Land Surveying, Various Routes
Results
Less than $500,000 est. value

Last Updated 08/25/2022 02:03 PM
Project Title

RFP Engineering - Combined Sewer Separation, Drainage Improvements and Storm Water Upgrades, Lead Water Service Replacement and Upgrades, and Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Addison, IL 60101   (DuPage County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The preliminary engineering study for the separation of combined sewers, wastewater treatment plant consolidation, and drainage improvements to the Cherokee Park area. This study will take place in the area between Lake St. to Fullerton Ave. and Addison Rd. to Villa Ave, excluding Normandy Dr. and Princeton St. The study shall provide storm sewer sizing to accommodate a 10-year storm using the most current data. The sewer separation study shall also address any upgrade required at the Diversey Ave. Pump Station. It is also required to provide an analysis for lead water service line replacement in the combined sewer area. The engineer shall be required to conduct an analysis on the wastewater treatment plants to determine the best method for treatment plant consolidation. The study shall include a plan to decommission the AJ LaRocca Facility and convey all flow to the North Waste Water Treatment Plant. It shall be required to determine the most efficient route to convey the wastewater to the North WWTP. It shall be required to develop a plan for plant expansion at the North WWTP as well as capacity and treatment for a combined sewer overflow (CSO). It shall be required to provide an overview on the entire treatment process for the North WWTP to take on the additional flow and comply with phosphorus removal regulations. The study shall state the method for phosphorus removal to comply with a 1.0 mg/L, 0.5 mg/L, and 0.1 mg/L limits. To reduce overland flooding it shall be required to develop a drainage plan for the area north of Cherokee Park. Cherokee Park is owned by the Village of Addison and Addison Park District. It shall be required to determine the amount of land required for retention, the method to hold and release storm water, and provide adequate calculations for retention. Technical questions concerning the RFP may be directed to: Ryan Hayden, Superintendent of Public Works: rhayden@addison-il.org Questions concerning the RFP documents and submittal may be directed to: Anna Hendrey, Purchasing Agent, ahendrey@addison-il.org The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents