Similar Projects
Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

Town Square Streetscape - City of Indianola
Infrastructure
Design
$4,700,000 est. value
Indianola, IA

Wastewater Treatment Facility Improvements
Renovation, Infrastructure
Bidding
$4,149,373 CJ est. value
Corydon, IA 50060

Park ADA Access Project Rebid
Infrastructure
Bidding
$36,454 CJ est. value
Iowa City, IA 52240

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

Playground - City of Ankeny
Infrastructure
Pending Verification
$225,000 CJ est. value
Ankeny, IA 50023

Playground - City of Ankeny
Infrastructure
Pending Verification
$225,000 CJ est. value
Ankeny, IA 50023

Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
Ames, IA 50014

Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs
Infrastructure
Bidding
$5,000,000 CJ est. value
Johnston, IA 50131

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

Last Updated 08/05/2022 09:36 AM
Project Title

Greene Street Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Postville, IA 52162   (Allamakee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $220,076 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. All work shall be completed by November 10, 2022, subject to any extensions of time which may be granted by the City Council.Construct Greene Street Sanitary Sewer Improvements including all labor, equipment and materials necessary for removal of sanitary sewer, removal of structure, installation of 8"-21" sanitary sewer, sanitary and storm manholes; pavement; and miscellaneous associated work, including cleanup. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa NB-2 32451 bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of five percent (5%) of the bid. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The City of Postville reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents