Similar Projects
Bexley North - Infrastructure
New Construction
Design
Inman, SC

NSTEP Round 15 Sidewalk Improvements Project
Infrastructure
Bidding
Greenville, SC 29613

Construction of a Walking Track in Promised Land
Infrastructure
Bidding
Bradley, SC 29819

Greenwood District Office Site Improvements
Post-Bid
$40,000 to $70,000 est. value
Greenwood, SC 29646

Sidewalk Repair - District Office
Term Contract
Post-Bid
Anderson, SC 29625

River Park Recreation Area-Trail Package
Results
Rock Hill, SC 29730

Health Department Parking Lot Sealing and Striping
Results
Union, SC

CVS #2555 - ADA Site Renovations
Renovation - 4,500 SF
Construction
Gaffney, SC 29341

CVS #3565 - ADA Site Renovation
Renovation - 10,186 SF
Construction
Cheraw, SC 29520

Paving Solicitor's and Sheriff's Parking Lot
Alteration
Bidding
Saint George, SC 29477

New Parking Lot
Post-Bid
Cheraw, SC 29506

Site Work, Grading and Paving for Accessible Areas at Kids Planet Playground
Results
Greer, SC 29651

Usc West Campus Parking Development
Infrastructure
Bidding
$1,000,000 to $1,200,000 est. value
Columbia, SC 29201

CVS #7016 - ADA Site Renovations
Renovation - 2,491 SF
Post-Bid
Pawley's Island, SC 29585

Ramp Modification
Results
Less than $20,000 est. value
Pageland, SC 29728

Reported 08/06/2021 12:00 AM
Project Title

Adams Drive Sidewalk Project, Phase 1

Physical Address View project details and contacts
City, State (County) Abbeville, SC 29620   (Abbeville County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the installation of approximately 325 linear feet of concrete curb and gutter, 505 linear feet of 5" wide sidewalk, 40 linear feet of 18" RCP, 20 linear feet of 15" ADS n-12, 24 linear feet of 8" ADS N-12, one catch basin, one ADA concrete handicap ramp, one concrete parking pad, 2 wheelstops, 500 cubic yards of backfill, and grassing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents