Similar Projects
1121 Electric Avenue Warehouse and Office
New Construction, Infrastructure - 17,774 SF
Design
$3,000,000 CJ est. value
Wayland, MI 49348

Middle School Pool and Gym Addition Bid Package 4
Addition, Demolition, Infrastructure
Design
$6,174,591 CJ est. value
Plainwell, MI 49080

Plainwell Spillway Removal and Channel Restoration - Phase 1
Infrastructure
Bidding
$1,873,196 CJ est. value
Otsego, MI 49078

Bid Package #3 - L.E. White Middle School Tennis Court Renovation
Renovation
Bidding
$500,000 CJ est. value
Allegan, MI 49010

Saugatuck Middle School/High School
New Construction
Post-Bid
Saugatuck, MI 49453

L.E. White MS Addition, Site Work, Secure Entry Bid Pack #1
Renovation
Post-Bid
Allegan, MI

Ebersole Environmental Center Site Improvements
Infrastructure
Results
Wayland, MI 49348

High School Pool Addition
Addition, Infrastructure
Results
Otsego, MI 49078

Harvest Meadows Phase II Condominiums
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Leighton Township, MI 49348

Middle School Pool and Gym Addition Bid Package 5
Addition, Demolition, Infrastructure
Design
$6,174,591 CJ est. value
Plainwell, MI 49080

Gun Lake Casino N Stormwater Basin Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Shelbyville, MI 49344

Flat Rock Esser Funds 2022 Project
Renovation
Post-Bid

2022 Shared Use Path Repairs
Infrastructure
Results
$437,925 CJ est. value
Park Township, MI 49424

Middle School Pool and Gym Addition Bid Package 3
Addition, Demolition, Infrastructure
Bidding
$6,174,591 CJ est. value
Plainwell, MI 49080

Bid Package #2 LE White Middle School Remodel
Renovation
Post-Bid
$530,000 est. value
Allegan, MI 49010

Last Updated 11/22/2022 10:39 AM
Project Title

Middle School Pool and Gym Addition Project - Packages 1 & 2

Physical Address View project details and contacts
City, State (County) Plainwell, MI 49080   (Allegan County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Middle/Senior High School, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $6,174,591 [brand] Estimate
Plans Available from Construction Manager - 08/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

Plainwell Community Schools will receive proposals from qualified contractors for the Middle School Pool & Gym Addition Project. Bids due August 30, 2022: Proposals for Sitework and Concrete Bids due November 3, 2022: Landscaping, Precast Concrete, Masonry and Structural steel All proposals must be sealed in envelopes, plainly labeled "Proposal for Plainwell Community Schools - Middle School Pool & Gym Addition, Bid Division Any questions or RFI's should be submitted in writing to David Beckering; email: djb@beckering.com All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship between the bidder and any employee of the School District or member of the Board of Education. Proposals that are not accompanied by this sworn and notarized statement of disclosure will not be accepted All proposals shall be accompanied by Affidavit of Compliance - Iran Economic Sanctions Act in compliance with "Iran linked business" within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012. Proposals that are not accompanied by this Affidavit of Compliance will not be accepted. A bid security in the amount of 5% of the bid in the form of a bid bond, certified or cashiers' check is required and payable to Plainwell Community Schools. Bid Results: Bid Division D: Landscaping Harder & Warner X X X X 72,598.00 Bid Division G: Precast Concrete Fabcon X X X X X 498,000.00 Bid Division H: Masonry Burggrabe Masonry X X X X X 3,704,993.00 Bid Division I: Structural Steel Van Dellen Steel X X X X X 2,397,000.00 Performance, labor and material bond costs (which cover 100% of the value of the project) should be bid separately on the line provided on the bid form. Do not include the cost of PLM Bonds in your base bid. Applicable Michigan sales and use tax apply to this project. The Owner reserves the right to accept or reject any or all bids and to waive any irregularities in proposals. Proposals shall remain firm for sixty (60) days from date of bid opening. Bid Result. Bid Division A: Sitework: Sitework Solutions $1,043,210.00 Bid Division E: Concrete: Burgess Concrete $2,366,369.00 g-1: community pool locker rooms: construct the additional building areas as delineated throughout the construction documents. a-1: pool balcony handrails: base bid is painted steel pickets to match running track. alternate is aluminum and glass railing system g-2: varsity locker room showers: construct additional shower stalls and the infrastructure necessary to support them a-2: mobile gymnasium bleachers: base bid will be no mobile bleachers. alternate will be adding the mobile bleacher sections intended for the east end of the basketball court. s-1: pool slab thickness: base bid is the 12" thick with 2 rebar mats, alternate is the 24" slab. g-3: middle school gym mechanical systems: replace existing ms gymnasium mechanical systems with new, including all necessary

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents